Laserfiche WebLink
• <br /> UNIFIED PROGRAM CONSOLIDATED FORK <br /> UNDERGROUND STORAGE TANK <br /> .MONITORING PLAN (Page2of 2) <br /> VL UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD <br /> y.,, 1 <br /> 90-sa4 <br /> ,I� 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CRAM ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 4� <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify—):fes--�— <br /> PANEL MANUFACTURER: y E Q 1 r"1lX.:t- �su-ss —" <br /> -� MODEL It - 4W56, <br /> LEAK SENSOR MANUFACTURER: F'E Cl e ------4vo-s� — 4 eh' ------- <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE ANO VISUAL ALARMS MODEL(I(S),F - 49osa <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWNW5 YES <br /> a-YES El b.NO 49as9 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. yE$ ❑b.NO °90-60 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑b.NO ° � <br /> 2.UDC CONSTRUCTION IS 1.SINGLE-WALLED 112.DOUBLE-WALLED Q e'YES ❑b.NO 490-62 <br /> 2F DOUBLE WALLED: 9 <br /> UDC INTERSTITIAL$PACE IS MONITORED BY: ❑L LIQUID ❑2 PRESSURE g 3.VACUUM490.644 <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS__❑a YES ❑b.NO 49afi4b <br /> VIL PERIODIC SYSTEM TESTING <br /> I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 4g 3, <br /> LEAK DDRUCTION( DI MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE I. RED. 23 CCR 62644.1) <br /> ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 4 <br /> [33.SPILL BUCKETS ARE TESTED ANNUALLY. - — a90 <br /> 490 6r <br /> VIM RECORDKBEPING <br /> 77�following monitoring/m�aip[enan--records are kept for this facility: <br /> Q Alarm logs 49 8e L;J Visual Inspection Records M-6ab <br /> ❑SIR testing results(and supporting documentation records). 4W6ed [I Tank integrity resting results <br /> 9ATG Testing results(and supporting documentation records.4W68r ❑ Tankgaugingectio 60-day supporting <br /> records). ago-ase <br /> 11 Corrosion Protection 60-day logs 49068g <br /> ❑Equipment maintenance and calibration records. 490e8n <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities arc familiar with all of the following documents relevant to theirjob duties. 490. <br /> REFE ENCF.DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> OTHIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49 qh <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)~I, <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49o-am <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-6 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"4o­a9r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490.69a <br /> OTHER(Specify):M6911 Mag; <br /> This facility has a"Designated UST Operator'who has passed the Califomia UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> > 0 <br /> perad0n of the UST systems in a manner consistent with the facility's best management practices <br /> > The facility employee's role with regard to the monitoring equipment 0 specified in this UST Monitoring Plan <br /> I. <br /> The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> > Names of contactperson(s)for emergencies and monitoring alarms.49aw <br /> X. COMMENTSIADDTTIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with adAitioold information on specific monitoring procedur are attached to this Plain.4fi <br /> r�: �u(�LS Lit. u rYie c.f�c�fkc s (Q ;Lr s xt t> f c hcL(r re mcot(. <br /> ill�flL For(L VI CL ` 1 n1C'I I)L CLI 1,deC� l <br /> AL PRRSONNEL RESPON.,,wLLjII <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The folio 'ng persons)are res ible far performigg t a ni oring and equipment m�I,ntenance / <br /> NAME .(nw, - )3 t.)'(L - L�e7t ( C, s9o-92 TITLE r.,c, t loll L %lQ-FC �i(,C'I <br /> NAME L IT �, .1{- _ - a90-n <br /> The Desi r' 4sa74 TITLE '.i) - L 7t.'L Q. Ql^ 49an <br /> gthat Operator II perform a montltly visual inspection of the facility,provide a report to the- er/ope ,and inform t owner/operator of any <br /> conditions that need follow-up action. <br /> XIL OWNEWOPERATOR SIGNATURE <br /> ERTIFICATION:I certify that the inforrnation provided herein is true and accurate to the <br /> APPLICANT SI ge- / <br /> 4g0o6 DATE: 4g 77 <br /> APP ]CANT 4AME(print): 49a73 <br /> 1 �'II L.`� APPLICANT TITL`: .79 <br /> UPCF UST-D(12/2007)3/4 <br />