My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1347
>
2300 - Underground Storage Tank Program
>
PR0501013
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:31 PM
Creation date
11/4/2018 3:58:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0501013
PE
2381
FACILITY_ID
FA0004962
FACILITY_NAME
CHEVRON 90342 (INACT)
STREET_NUMBER
1347
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14716030
CURRENT_STATUS
02
SITE_LOCATION
1347 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\1347\PR0501013\REMOVAL 1989.PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
11/28/2012 8:00:00 AM
QuestysRecordID
75218
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T0: San Joaquin Local Health District August 2, 1989 <br /> Re. : Chevron USA at 1347 Charter Way and E1 Dorado <br /> 1. Underground utilities on site: USA underground will identify and mark <br /> underground utilities per law. The product pipes will be rinsed back into <br /> tank. <br /> 2. Erickson Inc. will triple rinse the tanks (415) 235-1393. <br /> 255 Parr Rd. Richmond, CA. 94801 <br /> 3. The tank will be triple-rinsed with pressure washer and Simple Green <br /> concentrated detergent. <br /> 4. Erickson Inc. will haul rinsate to Chevron bulk plant CAD1009466392. <br /> 5. To purge the tank, 20 lb. of dry ice per 1,000 gallon of the tank will <br /> be used. Cot will be used after dry ice. <br /> 6. Soil samples will be taken from top dirt in back-hoe bucket. Location of <br /> samples taken will be determined in the field by SJLHD lab technician. <br /> 8" brass tubes will be used to take samples. In the case of water being <br /> in the hole, bottles will be used to transport the water samples to lab. <br /> 7. The soil sampler will be Blaine Tech-(408) 723-3974 San Jose. <br /> B. The piping will be taken to Levins Metal in Stockton and the Fiberglass <br /> tank will be crushed on site and hauled to disposal site. <br /> ( Date �Z <br /> Seibold Corporation <br /> 4' <br />
The URL can be used to link to this page
Your browser does not support the video tag.