My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1448
>
2300 - Underground Storage Tank Program
>
PR0506371
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:33 PM
Creation date
11/4/2018 3:59:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0506371
PE
2381
FACILITY_ID
FA0007375
FACILITY_NAME
MULTI-DAY ENTERPRISES INC
STREET_NUMBER
1448
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
13902008
CURRENT_STATUS
02
SITE_LOCATION
1448 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\1448\PR0506371\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kn K L E I N F E L D E R <br />�Wv"" "" unm=1,..ngrnp. <br />File No. 20-3908-0I.M03 <br />October 15, 1996 <br />Mr. Martin Thorpe <br />Jim Thorpe Oil Company <br />351 Beckman Road <br />Lodi, California 95240 <br />Subject: FIELD DENSITY TESTS - CHIEF AUTO PARTS <br />1448 N. ELDORADO - STOCKTON, CA <br />Dear Mr. Thorpe: <br />Permit No. 96-3828 <br />This report presents the results of compaction tests taken at the subject project. At your request, <br />Messrs. Dennis Quashnick, Joseph Fulton, Harold Cochran, and John Clarkson of our firm <br />observed earthwork operations and performed tests at the site on October 8, 9, and 10, 1996, <br />on an intermittent basis. Eighteen tests were taken by the nuclear probe test method at random <br />locations on tank and footing excavation backfill. The depth of tank backfill was approximately <br />14 feet. <br />Samples of the materials tested were brought to our laboratory for determination of the maximum <br />density -optimum moisture content. The test results, shown on Table 1, conform to the <br />compaction requirements of the project specifications. <br />Since Kleinfelder, Inc. did not perform a geotechnical study for this site, we cannot accept any <br />responsibility for the adequacy of any geotechnical recommendations. The scope of our work <br />was strictly limited to density testing in the areas noted. <br />We have employed accepted engineering and testing procedures. However, we do not undertake <br />the guarantee of construction, nor do we relieve the contractor of his primary responsibility to <br />produce a completed project conforming to the project plans and specifications. <br />If you have any questions about this report, please call our office. <br />Respectfully submitted, <br />KLEINFELDER, INC. <br />k l' l�f <br />Dennis A. Qua nick, P.E. <br />Project Engineer <br />DAQ:Ir Attachments cc: City of Stockton <br />KI EINFFIDER 2825 East Mynlc Street, Sto( kion, CA 95205-4794 (209) 948-1145 LR960157 0 1996 Klein@Ider, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.