Laserfiche WebLink
File No. 20-3908-01.M03 <br />October 15, 1996 <br />Page 2 of 2 <br />k'q KLEINFELDER <br />Nccep d maioariW and loan& pemdee were ned fn Wee bla. Tt a above mu L premed far � iim W my. W We at eoce of eombem a mn® ar� peraamet at We si, we carrot eryree w, opioim <br />u W Wa adequacy of afire preparadm a oven& M oamwetim. We do e e mdenate ar &armee a ematnd % nor do we mis ds emra of hie primary mpmibinty b peva e a eoergled peejea o .re b& m da: <br />prtjea plan aM apeelaedma, C pyn&bt 1996 Kleidf Wer. W. <br />Depth From <br />Dry <br />Laboratory <br />Specified <br />Test <br />Finished <br />Moisture <br />Density <br />Compaction <br />Relative <br />Relative <br />No. <br />Date <br />Test Location <br />Subgrade (R.) <br />% Dry Wt. <br />P.C.F. <br />Curve No. <br />Compaction <br />Compaction <br />RETAINING WALL <br />12 <br />10-9 <br />East end <br />-1.0 <br />11.2 <br />117 <br />3 <br />95 <br />95 <br />13 <br />10-9 <br />West end <br />FSG <br />12.5 <br />121 <br />3 <br />98 <br />95 <br />FOOTING AREA <br />14 <br />10-9 <br />East end <br />FSG <br />10.1 <br />118 <br />3 <br />96 <br />90 <br />TANK EXCAVATION <br />15 <br />10-9 <br />Center <br />-3.0 <br />13.1 <br />117 <br />3 <br />95 <br />90 <br />16 <br />10-9 <br />Center <br />-1.5 <br />12.2 <br />115 <br />3 <br />93 <br />90 <br />BUILDING PAD <br />17 <br />10-10 <br />Southeast side <br />FSG <br />8.6 <br />117 <br />3 <br />95 <br />95 <br />PARKING <br />18 <br />10-10 <br />Pit area <br />FSG <br />13.1 <br />112 <br />3 <br />91 <br />90 <br />Nccep d maioariW and loan& pemdee were ned fn Wee bla. Tt a above mu L premed far � iim W my. W We at eoce of eombem a mn® ar� peraamet at We si, we carrot eryree w, opioim <br />u W Wa adequacy of afire preparadm a oven& M oamwetim. We do e e mdenate ar &armee a ematnd % nor do we mis ds emra of hie primary mpmibinty b peva e a eoergled peejea o .re b& m da: <br />prtjea plan aM apeelaedma, C pyn&bt 1996 Kleidf Wer. W. <br />