My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1448
>
2300 - Underground Storage Tank Program
>
PR0506371
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:33 PM
Creation date
11/4/2018 3:59:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0506371
PE
2381
FACILITY_ID
FA0007375
FACILITY_NAME
MULTI-DAY ENTERPRISES INC
STREET_NUMBER
1448
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
13902008
CURRENT_STATUS
02
SITE_LOCATION
1448 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\1448\PR0506371\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INV .i <br />BACKFILL EXCAVATION CERTIFICATE <br />1444 N. E1 Dorado St., Stockton, CA 95202 <br />Project Location ---(209) 669-2610 <br />Multi — Day Enterprises Phone No. <br />Owner <br />Contractor JIM THORPE OILINC. Phone No. (209)368-6175 License No.495 9 <br />INUICA9I MEI'tiOD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soil Englneer's Compaction Report within 30 days or project completion, or <br />2. subndsslon or verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br />was placed in the excavation In 12" lifts: <br />_ A. Pea gravel --smooth, rounded gmaterial not more than one-half iInch in diameter . <br />ets <br />Inch Irl cross <br />nal <br />B Climbed meneuremenk. (Use of cru shed rock will not be permittet more I d for baonrtckfill if contact a011becmade between <br />the backfill material and tanks/pipes made or poly resin gloss or similar materials.) <br />DECLARATION <br />I belchabovecettify that a Still Enginccr's Compaction Report will be xubndtted within 3n on0 da s or i of �roject compietion, or submission <br />In <br />ofverillelentrand that ,wiccithe matire erial <br />avatloniwilt be backfilled and compaclaced at a ted) o Insure compliance cubicwith thards e Uner ifformlBuilding <br />Code Appendix Chaplet 70. <br />• JIM TNORPE OIL,INC. <br />ame ( r nq <br />• CONTi KI: <br />.' � li (Yr�l�- <br />JA 3�ignature <br />Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.