Laserfiche WebLink
3ALIFORNIA MONTHLY <br />STATISTICAL INVENTORY RECONCILATION (SIR) REPORT <br />SIR Provider ETL Southwest Phone (602) 837-8738 <br />SIRAS — version 2.8.3 1 Date of SIR report 9/14/96 <br />y7. 8 19 8 1 What is the required number of usable inventory days per tank? 30 <br />Unocal No. 4409 <br />a 1502 N. EI Dorado <br />Stockton, CA 95204 <br />FACILITY NAME - <br />Unocal No. <br />4409 <br />TANK <br />LOCATION <br />_ <br />Address <br />1502 N. EI DoradoClty <br />Stockton <br />Phone (714) 572-7653 Zip 95204 <br />P <br />TANKOWNER <br />Name <br />Unocal <br />Address 2929 E. Imperial Highway <br />City Brea Phone (714) 572-7653 <br />Name <br />Unocal <br />Phone <br />(714) 572-7653 <br />87-1 Regular Unleaded <br />pTankNo. <br />12000 <br />Leak <br />Threshold <br />gph <br />0.10 <br />This Month <br />Minimum Calculated Pass, Fail, <br />Detectable Leak Rate (6b) Inconclusive <br />Leak Rate (6c) <br />gph gph P F I <br />0.20 0.01 <br />Last <br />Month (7) <br />Two <br />Months <br />Ago (7) <br />Pass, Fail, <br />inconclusive <br />Pass, Fail, <br />Inconclusive <br />P F I <br />P F I <br />' <br />92-1 Premium <br />Unleaded <br />12000 <br />0.10 <br />0.20 <br />0.10 <br />• <br />' <br />DSL -1 Diesel <br />12000 <br />0.10 <br />0.20 <br />0.01 <br />NOTE: N/A indicates No Analysis Performed Negative Calculated Leak Rates Indicate a Gain <br />The tank owner is required to have an SIR report for each month [Section 2643 (b)(3) CCR']. <br />Monthly reports must be submitted to the local agency upon request [Section 2712 (b) CCR]. <br />The tank owner is required to have the report by the 20th day of the following month [Section 2646.1 (c) CCP]. <br />If for any reason, the test is neither 'pass' nor 'fail', the 'inconclusive column must be marked. <br />The local agency must be notified of a tank that does not pass the SIR test within 24 hours of receipt of the report and the SIR report must be <br />submitted to the local agency within 10 days of the date of the report [Section 2646.1 (d) CCR]. <br />Quantitative and Qualitative Methods: <br />a. A leak threshold, minimum detectable leak rate, and calculated leak rate must be provided for each tank. If not, then the tank failed the SIR test. <br />b. If the calculated leak rate for a tank is greater than or equal to the leak threshold, the lank failed the SIR test. <br />c. If the minimum detectable leak rate for a tank is greater than the certified performance standard (i.e., 0.1 or 0.2 gph) and the calculated leak rate <br />is less than the leak threshold, the test is inconclusive for that month. <br />d. Two consecutive failures and/or inconclusives require a tank and/or piping integrity test within 15 days from the date of the <br />second report [Section 2646.1 (h) CCR]. <br />Optional. <br />Date <br />CCR means Tale 23, Division 3, Chapter 16 of the Caleomia Code of Regulations <br />SWRCB—SIRIMON-01 (12/94) <br />