Laserfiche WebLink
CALIFORNIA MONTHLY <br />STATISTICAL INVENTORY RECONCILATION (SIR) REPORT <br />Unocal No. 4409 <br />1502 N. EI Dorado <br />Stockton, CA 95204 <br />ETL Southwest <br />SIRAS — version 2.8.3 <br />3/96 <br />Unocal No. <br />4409 <br />Address <br />1502 N. EI Dorado <br />Phone <br />(714) 572-7653 <br />Name <br />Unocal <br />Address <br />2929 E. Imperial f <br />City <br />Brea <br />Name <br />Unocal <br />Leak <br />Threshold <br />Phone (602) 837-8738 <br />Date of SIR report 4/13/96 <br />What is the required number of usable inventory days per tank? 30 <br />City Stockton <br />Zio 95204 <br />Phone (714) 572-7653 <br />Phone (714) 572-7653 <br />Last Two <br />This Month Month (7) Months <br />Ago (7) <br />!mum Calculated Pass, Fall, Pass, Fall, Pass, Fail, <br />Datable Leak Rate (6b) Inconclusive Inconclusive I Inconclusive <br />NOTE: N/A indicates No Analysis Performed Negative Calculated Leak Rates indicate a Gain <br />1. The tank owner is required to have an SIR report for each month [Section 2643 (b)(3) CCR'). <br />2. Monthly reports must be submitted to the local agency upon request [Section 2712 (b) CCRJ. <br />3. The tank owner is required to have the report by the 20th day of the following month [Section 2646.1 (c) CCRJ. <br />4. If for any reason, the test is neither 'pass' nor 'fail', the 'inconclusive column must be marked. <br />5. The local agency must be notified of a tank that does not pass the SIR test within 24 hours of receipt of the report and the SIR report must be <br />submitted to thelocalagency within 10 days of the date of the report [Section 2646.1 (d) CCR]. <br />6. Quantitative and Qualitative Methods: <br />a. A leak threshold, minimum detectable leak rate, and calculated leak rate must be provided for each tank. If not, then the tank failed the SIR test. <br />b. If the calculated leak rate for a tank is greater than or equal to the leak threshold, the tank failed the SIR test. <br />c. If the minimum detectable leak rate for a tank is greater than the certified performance standard (i.e., 0.1 or 0.2 gph) and the calculated leak rate <br />is less than the leak threshold, the test is inconclusive for that month. <br />d. Two consecutive failures and/or inconclusives require a tank and/or piping integrity test within 15 days from the date of the <br />second report [Section 2646.1 (h) CCR]. <br />7. Optional. <br />CCR means Title 23, Division 3, Chapter 16 of the Calitomia Cade of Regulations <br />SWRCS—SIR/MON-01 (12/94) <br />gph <br />gph <br />gph P F I <br />P F I <br />P F I <br />Tank No. 87-1 <br />Regular Unleaded <br />12000 0.10 <br />0.20 <br />-0.02 <br />Tank No. 92-1 <br />Premium Unleaded <br />12000 0.10 <br />0.20 <br />0.02 <br />Tank No. DSL -1 <br />Diesel <br />12000 0.10 <br />0.20 <br />0.00 <br />NOTE: N/A indicates No Analysis Performed Negative Calculated Leak Rates indicate a Gain <br />1. The tank owner is required to have an SIR report for each month [Section 2643 (b)(3) CCR'). <br />2. Monthly reports must be submitted to the local agency upon request [Section 2712 (b) CCRJ. <br />3. The tank owner is required to have the report by the 20th day of the following month [Section 2646.1 (c) CCRJ. <br />4. If for any reason, the test is neither 'pass' nor 'fail', the 'inconclusive column must be marked. <br />5. The local agency must be notified of a tank that does not pass the SIR test within 24 hours of receipt of the report and the SIR report must be <br />submitted to thelocalagency within 10 days of the date of the report [Section 2646.1 (d) CCR]. <br />6. Quantitative and Qualitative Methods: <br />a. A leak threshold, minimum detectable leak rate, and calculated leak rate must be provided for each tank. If not, then the tank failed the SIR test. <br />b. If the calculated leak rate for a tank is greater than or equal to the leak threshold, the tank failed the SIR test. <br />c. If the minimum detectable leak rate for a tank is greater than the certified performance standard (i.e., 0.1 or 0.2 gph) and the calculated leak rate <br />is less than the leak threshold, the test is inconclusive for that month. <br />d. Two consecutive failures and/or inconclusives require a tank and/or piping integrity test within 15 days from the date of the <br />second report [Section 2646.1 (h) CCR]. <br />7. Optional. <br />CCR means Title 23, Division 3, Chapter 16 of the Calitomia Cade of Regulations <br />SWRCS—SIR/MON-01 (12/94) <br />