Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> b. Tank/Piping Hauler: <br /> Name -pfj "T It7 iac acs Ammaw ant &&A4(, LASAWAIS <br /> Address City zip <br /> Phone No.( <br /> Hauler Registration#(if hauled as hazardous) <br /> C. Tank/PipiingLDisposall Site: <br /> Name <br /> Address City zip <br /> Phone No.( ) <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YES 1Q NO [] <br /> 9a. Deg ribe,indetail,llow the soil and/or water sample(s)beneath the tank and piping will be obtain LdhJ <br /> U u✓v� ►= .44 L l ILC- fGD 'Tv <br /> L <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> eL� E ILL Y�t�&telL yW c L L FE, �l 'D T SITE F� <br /> VAck n1t- <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? <br /> c)Contaminated Soil Hazardous Waste Hauler: <br /> Name 6AJT-1 Milt--ha W— SAfflC.�i Hauler Registration# <br /> Addreas� <br /> city CidkA Zip <br /> Phone No. ( log 1 Ad <br /> EH 23 046(Revised 3/16/02) Page 6 <br />