My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2450
>
2300 - Underground Storage Tank Program
>
PR0519037
>
REMOVAL_2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 4:43:58 PM
Creation date
11/4/2018 4:07:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2002
RECORD_ID
PR0519037
PE
2381
FACILITY_ID
FA0014243
FACILITY_NAME
UNDEVELOPED PARCEL
STREET_NUMBER
2450
Direction
S
STREET_NAME
EL DORADO
City
STOCKTON
Zip
95206
APN
16707028
CURRENT_STATUS
02
SITE_LOCATION
2450 S EL DORADO
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\2450\PR0519037\REMOVAL 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be representative <br /> of native soils beneath the tank's invert(tank's bottom)at a collection depth not to exceed 2-4 feet. If contamination is documented <br /> during closure,an Unauthorized Release Notification must be completed and submitted within five(5)working days pursuant to <br /> California Health&Safety Code,Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 1 er Tank Fill OR Pump End of Tank <br /> 1,000- 10,000 2 er Tank I at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sa le ev 20 lineal feet <br /> TANK&PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER <br /> # (Gallons) of SOIL SAMPLES SAMPLES of WATER SAMPLES <br /> < 10,000 2 from wall next to tank <br /> Single Tank 3 ends at soillgroundwater 1 <br /> interface& I below tank <br /> 4 from wall next to tank <br /> > 10,000 OR ends at soiligroundwater - 1 <br /> Tank Cluster 5 or more interface& 1 below each <br /> tank <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000- 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> >10,000 5 OR More per Tank Ends and Middle and generally spaced <br /> along the length of the Tank <br /> EH 23 046(Revised 3/15/02) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.