Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> b. Tank/Piping Hauler: <br /> Name 0 /6MKw21 i 12 IO162e <br /> Address CityZip <br /> Phone No.( ) <br /> Hauler Registration #(if hauled as hazardous) <br /> c. Tank/Piping Disposal Site: <br /> Name Tn/r TD elf �ae/Yfhr`�� `h ��lcare <br /> Address City Zip <br /> Phone No.( ) <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> 0 <br /> 10. Describer how the excavation will be backfilled with suitable material upon removal: <br /> r /? <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> b) What will be the final destination of the excavated stockpile? <br /> �/XF <br /> c) Contaminated Soil Hazardous Waste Hauler: <br /> Name 2l✓ Hauler Registration # <br /> Address City Zip <br /> Phone No. ( ) <br /> 23 046 (Revised 7/10/96) Page 5 <br />