My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
325
>
2300 - Underground Storage Tank Program
>
PR0515441
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:35 PM
Creation date
11/4/2018 4:12:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0515441
PE
2381
FACILITY_ID
FA0012146
FACILITY_NAME
GATEWAY PROJECT
STREET_NUMBER
325
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14906112
CURRENT_STATUS
02
SITE_LOCATION
325 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\325\PR0515441\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'ACKFILL EXCAVATION CERTIFICATE <br />Project Location Block bounded by Lafayette, El Dorado, Center and Sonora Streets <br />Owner Redevelopment Agency of Stockton Phone No. 209-937-8320 <br />Contractor Evans Brothers Inc. Phone No. 925-443-0225 License No. 443018 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />X 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification. e.g.: load ticket, within 30 days of project completion that one of die following materials was <br />placed in the excavation in L' lifts: <br />A. Pea gravel—smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly ruin glass or similar materials.) <br />DECLARATION <br />I herebv certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic vards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />• Wayne Evans <br />i ame rmt) / <br />" Vice President p <br />Title 1 rm <br />ugna <br />Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.