Laserfiche WebLink
S. a. <br />Describe the method that will be atillzed to purge and/or inert the tank(s} <br />Will not be required - tank is clean <br />b. Tank/Piping Hauler. <br />Name Evans Brothers Inc. <br />Address 7589 National Drive City Livermore Zip 94550 <br />PhoneNo4 925 ) 443-0225 <br />Hauler Registration M (Lf hauled as hazardous) Non-Haz <br />TankMping Disposal Site: <br />Name Schnitzer Steel — <br />Address 1101 Fmharcadero West City Oakland Zip 94604 <br />Phone No.( 800 ) 449-3919 <br />EPA IDN (if transported to a permitted TSD facility) N / A <br />9. Is the sampling firm an independent third party from the contractor? TESD$ NO I ) <br />9a. Describe, In detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />Soil sample will be collected from beneath the former tank location by driving a <br />nrecleaned stainless steel sleeve into soil recovered from the sampling location by <br />_ a backhoe/excavator. Soil sample collected from former piping locations will be collect <br />by driving the sampler into undistrubed soil at the bottom of a hand -auger borehole. <br />10. Describe how the excavation will be backtWed with suitable material upon removal: <br />Excavation will be backfilled and compacted to finish grade per project <br />specifications with imported material on site. <br />11. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />b) What will be the anal destination of the excavated stockpile? <br />Sampling analysis will determine <br />c) Contaminated Soil Hazardous Waste Hauler. <br />Name Pendine sampling results Hauler Registration 0. <br />City <br />Phone No. <br />EH 23 046 (Revised 10119198) Page 5 <br />