Laserfiche WebLink
Sep -02-99 01:03P Evan= 5rotthers Inc. 925 "43 0229 P.05 <br />t;7 <br />Gateway Project - Stockton. CA Evans Brothers Inc. <br />1. INTRODUCTION <br />The project work to be done consists, in general, of demolition and disposal of a portion <br />of Block 37, East of Center Street in Stockton, California. All asbestos and lead will be <br />abated by others prior to demolition work. This Site Safety Plan is applicable to all <br />locations of this Project. The starting and sequence of each location of work will depend <br />on the needs of the project and the general contractor (Evans Brothers Inc.). <br />1.1 Background <br />Evans Brothers Inc. (EBI) developed this Site Safety Plan (SSP) for the Building <br />Demolition Project. The purpose of the SSP is to provide EBI field personnel and <br />subcontractors with an understanding of the potential chemical/substance and physical <br />haaardS that exist or may arise while the tasks of this project are perforated. <br />This SSP describes the procedures to be followed to reduce employee and public <br />exposure to potential health hazards that may be present on the project site. The <br />emergency response procedures necessary to respond to such hazards are also described <br />within this SSP. The SSP is primarily designed to guide project personnel on how to <br />respond to normal or extreme conditions that may arise during the project execution. <br />1.2 Objective <br />The primary objective is to ensure the well being of observers, field personnel and the <br />public surrounding the subject property. To do this, project staff, client personnel and <br />approved subcontractors shall acknowledge and adhere to the policies and procedures <br />established herein. Accordingly, all personnel assigned to this project shall read this <br />SSP and sign the Agreement and Acknowledgment Statement (Appendix A) to certify <br />that they have read, understood and agree to abide by this SSP and its provisions, <br />including the "Evans Brothers Inc. Injury and Illness Prevention Program'. <br />Information contained in the SSP will be presented to personnel and visitors at a pre - <br />entry safety briefing. Additional safety information which becomes pertinent over the <br />course of the project, will be conveyed to EBI and subcontractor personnel through <br />"tool -box safety meetings" (see EBI Injury and Illness Prevention Program) and, if <br />necessary, addendum to the SSP will be transmitted to pertinent subcontractors. In <br />addition, project personnel listed in Section 8 will continuously exercise supervision <br />and control of site activities as a part of their everyday practice. Safety issues will be <br />addressed immediately and discussed with involved EBI or subcontractor personnel on <br />a one-to-one basis. <br />EBI personnel have the authority to stop work activities and evacuate the area. The <br />chart in Section 8 showing the "chain of command" shows who has the authority to stop <br />work activities based on safety issues, beginning with the project manager. <br />1.3 Amendments <br />Any changes in scope of work of this project and/or site conditions must be amended in <br />writing on the Site Safety Plan Amendment Sheet (Appendix B) and approved by the <br />Health and Safety Manager. <br />Page 3 of 25 <br />