My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4032
>
2300 - Underground Storage Tank Program
>
PR0508130
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:31:38 AM
Creation date
11/4/2018 4:15:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0508130
PE
2381
FACILITY_ID
FA0007952
FACILITY_NAME
MARTINI AUTO
STREET_NUMBER
4032
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
11518501
CURRENT_STATUS
02
SITE_LOCATION
4032 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\4032\PR0508130\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/7/2012 8:00:00 AM
QuestysRecordID
77736
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARDo~'o <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION -FORM B tl°' = <br /> ( <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM, <br /> MARK ONLY Q 1 NEW PERMIT Q 3 RENEWAL PERMIT Q 5 CHANGE OF INFORMATION ❑ PERMANENTLY CLOSED SI <br /> ONE REM Q 2 INTERIM PERMIT Q 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MWAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> p ❑ I MOTOR VEHICLE FUEL 4 OIL B. C, 1A REGULAR UNLEADED Q 3 DIESEL Q 6 AVIATION GAS <br /> Q 2 PETROLEUM Q 80 EMPTY Q 1 PRODUCT ❑ 1b PREMIUM UNLEADED Q 4 GASAHOL Q 7 METHANOL <br /> Q 3 CHEMICAL PRODUCT Q BS UNKNOWN �/¢'WASTE ❑ Ic MOGRADE UPLEADED Q 5 JET FUEL Q 8 MB5 <br /> Q 2 LEADED Q 99 OTHER(DESCRIBE IN ITEM O.BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OFSUBSTANCE STORED C) C.A-S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> 1 DOUBLE WALL 3 SINGLE WALL WITH EXTERIOR LINER <br /> A. TYPE OF ��yy Q Q s INTERNAL BUDDER SYSTEM Q 95 UNKNOWN <br /> SYSTEM L10 22 SINGLE WALL Q 4 SINGLE WALL IN A VAULT Q 99 OTHER <br /> B. TANK R ' BARE STEEL ❑ 2 STAINLESS STEEL Q 3 FIBERGLASS Q 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL Q 5 CONCRETE Q 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE WIFRP <br /> (P,4nm TNN) ❑ 9 BRONZE Q 10 GALVANIZED STEEL ❑ 95 UNKNOWN Q 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED Q 2 ALKYD LINING - <br /> 3 EPDXY LINING Q 4 PHENOLIC LINING <br /> LINING OR Q 5 GLASS LINING Q 6 UNLINED BS UNKNOWN Q 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NO— <br /> D.EXTERIOR Q I POLYETHYLENE WRAP Q 2 COATING Q 3 VINYL WRAP Q 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE Q 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,MC. SPILL CONTAINMENT INSTALLED n ) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES NO STRIKER PLATE YES_ NO DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE UoA GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 UNED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE WAFRP <br /> PROTECTION A U 8 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION1 L4sOuwcu UK lFAlt 2 UK TBRRES4 3 wrm WS Im <br /> inS =m UNE U IC w �/ <br /> ❑ oE1EcrCR TE3THo Mx4Tonw9 ❑4 aEtTAX wTEcron ❑5 AsNUToow9 99 OTHER <br /> V,TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 MANUAL RECONCILIATION MONITORING <br /> ❑ 3 MODOZE NIITORING E:] 4 AUTOMATGAUGING MONITORING <br /> TANK Q5 GROUND MONTORINGTER ❑8 TESTING NK <br /> ❑ 7 <br /> MONITORING <br /> INTERSTITIAL Q 8 SIR ❑ 9 WEEKLY MANUAL ❑10 MONTHLY TANK ❑ 95 UNKNOWN % OTHER <br /> TANK GAUGING TESTING <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PUCE) <br /> 1.ESTIMATE DATE T USD( YNR) 2.ESTIMATED QUANTITY OF -!�\ 3.WAS TANK FILLED WITH YES Q NO <br /> SUBSTANCE REMAINING � [!GALLONS INERT MATERIAL? zrj <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> TANK OWNER'S NAME \ DAT <br /> (PRNTB3 A 61G WAE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.Dl m <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPI(CATION-FORM A,UNLESS A CURRENT FORMA HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLO- FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING' 'RGROUND STORAGE TANK REGULATIONS <br /> FORM 8 (6-95) `� <br />
The URL can be used to link to this page
Your browser does not support the video tag.