My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4032
>
2300 - Underground Storage Tank Program
>
PR0508130
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 11:13:02 AM
Creation date
11/4/2018 4:15:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0508130
PE
2381
FACILITY_ID
FA0007952
FACILITY_NAME
MARTINI AUTO
STREET_NUMBER
4032
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
11518501
CURRENT_STATUS
02
SITE_LOCATION
4032 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\4032\PR0508130\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/15/98 TUE 15:23 FAX 2094671118 AGE STOCKTON % "— <br />� <br />BACKFELL EXCAVATION CERTIFICATE <br />Project Locatlam 4032 North El dorado Street y Stockton ca <br />Owner Bob Eustis Atone No. 209 471—n5nl <br />Contractor AOE Phone No. 467-1006 L.iceoseNo. 680227 <br />INDICATE METHOD OP SACKH .L QUALITY ASSURANCE <br />_ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion. or <br />-'*'�2. Submission of verification. e.g.. load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12' lifts: <br />✓A. pea gmvel-staooth. rounded material not more than one-half (112) inch in diameter <br />B. Crushed tock -self -compacting material not more than three -quartets (314) inch in cross sectional <br />measuremem. (Use of crashed mock will not be permitted for backfill if contact will he made between the <br />backfill material and tanksfpipes made of poly resin glass of similar mrteriBls-) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Repan will be submitted within 30 days of to complcfiw. or submission of <br />verification that the select material described above will be placed at a mini>mtm of five (5) =ic yardsper 1000 b�all1lon took <br />displacement and that the entire excavation will be backfilled and compacted to tome complumcc with the Uniform Budding Code <br />Appendix Chapter 70. <br />h if <br />" Shall be the responsible managing employee on the license or authorized agent. <br />I;(sa1{ q <br />SEP 15 1998 V <br />ENVIRONMENTAL HEALTH <br />PERMIT/SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.