Laserfiche WebLink
STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 8 TEMPORARY TANK CLOSURE ❑ B TANK REMOVED ro <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 3 d �. EZ <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.• B. MANUFACTURED BY: u/_VL� <br /> C. DATE INSTALLED(MO/DAYYYEAR) L D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A ❑ 1 MOTOR VEHICLE FUEL 4 OIL B. C. ❑ IS REGULAR UNLEADED ❑ 3 DIESEL ❑ 8 AVIATION GAS <br /> 2 PETROLEUM80 EMPTY 1 PRODUCT� ❑ lb PREMIUM UNLEADED E] 4 GASAHOL [:] 7 METHANOL <br /> j�� ❑ ❑ ❑ Ic MIDGRADE UNLEADED ❑ 5 JETFUEL ❑ 8 M85 <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN 2 WASTE 1 2 LEADED ❑ 99 OTHER(DESCRIBE IN IfEMO.BELOW) <br /> D. IF(A1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED - C.A S. <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ I DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK I BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (pT'-Oy T-k) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED F7 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING XB UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 10D% METHANOL? YES— NOLX <br /> D.EXTERIOR ❑ I POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION W91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E SPILL AND OVERFILL,BIC. SPILL CONTAINMENT INSTALLED R) VE FRILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ NO IKERPLATE YES_ NO_)!� DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION AQ)I SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND Aln1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U a CONCRETE A U 7 STEEL W/COATING A U 8 ID0% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 ME =R ME LEAK 2 NNE TIGNI M 3 CONTINUWS IMB6TIIIAL 4 ELEC9i0NIC LINE 5 AUTOIMTC WLP <br /> ❑ OELECfOR ❑ TESTIM ❑ MONi0RM0 ❑ LTAK DETECTOR I� SKII nC 99 OTHER Al <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 RECONCAL ILIATION CILIATIONORY ❑ 3 MAODOZE NIITORING ❑ 4 GAUGING AUTOMATIC TANK ❑ 5 GROUND MONITORING TESTING❑8 TTESTINGTANK <br /> ❑ 7 <br /> MONITORINGINTERSTITIAL ❑ B SIR ❑ 9 TALY NK GAUGING ❑10 MONTHLYTESTING TANK 95 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED O/DAY/YR) 2.ESTIMATED OUANTITV OF 3.WAS TANK FILLED WITH Y ❑ <br /> a,- SUBSTANCE REMAINING —.Cc—GALLONS INERT MATERIAL? NO <br /> 91 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE WD CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PPINTFD S SIGNANREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOWPk Q <br /> COUNTYM JURISDICTION M FACILITY k - KO <br /> STATE I.D.# (, <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXP <br /> j5'j4 <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULDBE ACCOMPANIED <br /> BYYLA PLOT PI Fl THIS FORM)NITH THE LOCAL AGENCY IMPLEMENTING <br /> MTHE""yERGGRRO'UN�DDSTORAGE <br /> ...TANK <br /> /REGULATIONS <br /> FORM B (695) A�C�� <br />