My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4554
>
2300 - Underground Storage Tank Program
>
PR0232014
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 12:00:32 PM
Creation date
11/4/2018 4:17:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0232014
PE
2361
FACILITY_ID
FA0003824
FACILITY_NAME
WASTE RECOVERY WEST INC
STREET_NUMBER
4554
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
4554 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\4554\PR0232014\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/7/2012 8:00:00 AM
QuestysRecordID
78248
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> TANKS <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> VL PIPING CONSTRUCTION(Clack a/DRAT appy) <br /> UNOEROROUND%%NG <br /> SYSTEM TYPE ❑ 1ABOVEGROUND PIPING <br /> . PRESSURE ❑ 2.SUCTION <br /> ❑ 3. GRAVITY ❑ 1. PRESSURE ❑ 2. SUCTION ❑ ]. GRAVITY <br /> CONSTRUCNOW ❑ 1. SINGLE WALL ❑ 3. LINEO TRENCH 1199 OTHER ❑ 1. SINGLE WALL ❑0. UNKNOWN <br /> MANUFACTURER ❑2. DOUBLE WALL ❑95. UNKNOWN <br /> MANUFACTURER 112. DOUBLE WALL ❑0, OTHER <br /> MANUFACTURER <br /> _ff 1.BARE STEEL ❑ 8. FRP COMPATIBLE WI IN%METHANOL ❑ 1. BARE STEEL <br /> MATERIALS AND ❑ Z STAINLESS STEEL ❑ T.GALVANIZED STEEL ❑ S. FRP COMPATIBLE W/100X METHANOL <br /> CORROSION ❑ 2. STAINLESS STEEL ❑ T. GALVANIZED STEEL <br /> PROTECTION ❑ 3. PLASMCCOMPATIBLEN4HCONTENT3 0 UNKNOWN ❑ 3. PLASTIC COMPATIBLE WITH CONTENTS ❑ 8. FLEKIBLE(HOPE) 13. OTHER <br /> ❑ 4. FIBERGLASS ❑ S. FLEXIBLE(HOPE) 1199 OTHER ❑ 4. FIBERGLASS ❑ 9. CATHODIC PROTECTION <br /> ❑ 5. STEELWI COATING ❑ S. CATHODIC PROTECTION ❑ 5. STEEL Wl COATING ❑95. UNKNOWN <br /> VU.PIPING LEAK DETECTION(CMck M fMf appy) <br /> UNDERGROUND PWING <br /> SING WALL%%NG ABOVEGROUND PIPING <br /> PRESSURIZED%PING(CMck a/that apply): PRESSURIZED PIPING(CMck a/Pat appM: <br /> LEAK,SYSTEM FAILURE,AND SYSTEMM DISCONNECTION SINGLE WALL PIPING - <br /> ❑ 1. ELECTRONIC UNE LEAK DETECTOR GPM TEST TION AUTO PUMP SHUT OFF FOR ❑ 1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPM TEST WITH AUTO PUMP SHUT OFF FOR LEAK <br /> ALARMS •AUDIBLE AND VISUAL SYSTEM FAILURE,AND SYSTEM DISCONNECTION•AUDUDIBLE AND VISUAL ALARMS <br /> ❑ 2. MONTHLY 02 GPH TEST ❑ 2. MONTHLY 0.2 GPM TEST <br /> ❑ 3. ANNUAL INTEGRITY TEST(0,I GPM) ❑ 3.ANNUAL INTEGRITY TEST(0,1 GPH) <br /> ❑ 4. GAILYVISUALCHECK <br /> CONVENTIONAL SUCTION SYSTEMS: CONVENTIONAL SUCTION SYSTEMS(CMck all flat appy): <br /> ❑ 5 DAILY VISUAL MONITORING OF PUMPING SYSTEM-TRIENNIAL PIPING INTEGRITY ❑ 5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> TEST(01 GPM) <br /> ❑ 8. TRIENNIAL INTEGRITY TEST(0.1 GPM) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> 11 iSELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> . <br /> 11 7, SELF MONITORING <br /> GRAVITY FLOW'. <br /> ❑ 9 BIENNIAL INTEGRITY TEST to 1 GPM) GRAVITY FLOW(Cbk 0 pat apply)' <br /> ❑ 8. DAILY VISUAL MONITORING <br /> ❑ 9 BIENNIAL INTEGRITY TEST(0 1 GPM) <br /> SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(CA ka/Mat appy). SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(CNepk a/par appy): <br /> 10 CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL AND <br /> )Clea.) 10.CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL ALARMS AND(Nock ane) <br /> ❑ a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑ a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑ a AUTO PUMP DISCONNECTIONT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑ 0 AUTO PUMP SHUT OFF FOR LEAKS.SYSTEM FAILURE AND SYSTEM DISCONNECTION <br /> ❑ p. NO AUTO PUMP SHUT OFF ❑ 1 NO AUTO PUMP SHUT OFF <br /> ❑ 11 AUTOMATIC UNE LEAK DETECTOR f3.0 GPM TEST)WITH FLOW SHUT OFF OR ❑ it AUTOMATIC LEAK DETECTOR <br /> RESTRICTION <br /> ❑ 12 ANNUAL INTEGRITY TEST 10.1 GPM) ❑ 12.ANNUAL INTEGRITY TEST(0 1 GPM) <br /> SUCTIOWGRAVITY SYSTEM'. SUCTION/GRAVITY SYSTEM: <br /> ❑ 13. CONTINUOUS SUMP SENSOR•AUOISLEANO VISUAL ALARMS ❑ 13. CONTINUOUS SUMP SENSOR•AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Clack a/Nor appy) EMERGENCY GENERATORS ONLY(CMck A/Nat apply) <br /> ❑ 14.CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMPSHUTOFF•AUDIBLE AND ❑ ta. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF•AUDIBLE AND VISUAL <br /> VISUALALARMS ALARMS <br /> ❑ 15.AUTOMATIC UNE LEAK DETECTOR(00 GPM TEST)WITMOUT FLOW SHUT OFF OR ❑ 15. <br /> RESTRICT;ON AUTOMATIC LINE LEAK DETECTOR(30 GPX TEST) <br /> ❑ 18.ANNUAL INTEGRITY MST(0 1 GPM) ❑ 18.ANNUAL INTEGRITY MST(0 1 GPM) <br /> ❑ 1T. CMLYVISUALCHECN ❑ 17. DAILY VISUAL CHECK <br /> VRI.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT ❑ 1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑ 4. DAILYWSUALCHECK <br /> DATE INSTALLED ❑ 2. CONTINUOUS DISPENSER PAN SENSOR•AUDIBLE AND VISUAL ALARMS ❑ 5. TRENCH LINER/MONITORING <br /> ❑ 3. CONTINUOUS DISPENSER PAN SENSOR WTH AUTO SMUT OFF FOR DISPENSER•AUDIBLE AND VISUAL ALARMS biz-6. NONE <br /> UL OWNER/OPERATOR SIGNATURE <br /> I ca151)'ha[Ne 68amaWn prwka4 Mian is OVe aM aCWraa b 51a brt pl my MnPMaa2a. <br /> SIG9U EOF ERIOPERA DAA <br /> a - - O <br /> NAME OF GWNERAOPERA (OHIO TITLE OF EILOPERATOIr <br /> Pamvr NumYr(FarbcN uta only) PartNIAppIRkH(iwkglPae alpYl Pemul EapkaePnDM(FwkNal vaa ar/k9 <br /> CUPAFORM(4199) `, <br /> Formerly SWRCB Form 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.