My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7200
>
2300 - Underground Storage Tank Program
>
PR0231561
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:25:52 AM
Creation date
11/4/2018 4:22:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231561
PE
2381
FACILITY_ID
FA0000104
FACILITY_NAME
QUICK N SAVE*
STREET_NUMBER
7200
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19316002
CURRENT_STATUS
02
SITE_LOCATION
7200 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\7200\PR0231561\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/17/2012 8:00:00 AM
QuestysRecordID
78747
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"IFIED PROGRAM CONSOLIDATED FORII� <br /> TANKS <br /> UNDERGROUND STORAGE TANKS-TANK PAGE 2 <br /> VI.PIPN OCONSTRUCTWN'Mheok.IIWApply) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE 1 PRESSURE ❑ 2. SUCTION ❑ 3. GRAVITY ❑ 1. PRESSURE ❑ 2. SUCTION ❑ 3. GRAVITY <br /> CONST�UOTION/ 1. SINGLE WALL ❑ 3. LINEDTRENCH ❑9B. OTHER ❑ t. SINGLE WALL [3 95. UNKNOWN <br /> MANUFACTURER ❑ 2 DOUBLE WALL ❑95. UNKNOWN ❑ 2. DOUBLE WALL ❑W. OTHER <br /> ' MANUFACTURER MANUFACTURER <br /> Q 1.BARE STEEL ❑ B. FRPCOMPATIBLEW110 METHANOL ❑ 1. BARE STEEL ❑ 4. FRP COMPATIBLE WI I MI METHANOL <br /> MATERIALS AND ❑ 2. STAINLESS STEEL ❑ T. GALVANIZEDSTEE� ❑ 2. STAINLESS STEEL ❑ T. GALVANIZED STEEL <br /> CORROSION <br /> ❑ <br /> PROTECTION 9. FUSTIC COMPATIBLE WITH CONTENTS 95 UNKNOWN ❑ 3. PLASTIC COMPATIBLE WITH CONTEXTS [38. FLEXIBLE(HOPE) 98.OTHER <br /> ❑ 4 FIBERGLASS ❑ 8. FLEXIBLE(HDPE) ❑99 OTHER ❑ 4 FIBERGLASS ❑ B. CATHODIC PROTECTION <br /> El 5. STEELW/COATING ❑ 9. CATHODIC PROTECTION ❑ 5. STEEL W/COATING 0 9 UNKNOWN <br /> W.PIPING LEAK DETECTION(Check a#flat appy) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING SINGLE WALL PIPING <br /> PRESSURIZED PIPING(Check as that app19.. PRESSURIZED PIPING(Clack all that apply): <br /> ❑ 1. ELECTRONIC LINE LEAK DETECTOR 3.0 OFF TEST WITH AUTO PUMP SHUT OFF FOR ❑ 1. ELECTRONIC UNE LEAK DETECTOR SD GPH TEST WITH AUTO PUMP SHUT OFF FOR LEAK. <br /> LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION;AUDIBLE AND VISUAL SYSTEM FAILURE,AND SYSTEM DISCONNECTION;-AUDIBLE AND VISUAL ALARMS <br /> ALARMS ❑ 2. MONTHLY 0.2 GPH TEST <br /> ❑ 2. MONTHLY 0.2 GPM TEST ❑ 3. ANNUAL INTEGRITY TEST(DA GPH) <br /> ❑ 3. ANNUAL INTEGRITY TEST(0 1 GPH) ❑ 4. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS'. CONVENTIONAL SUCTION SYSTEMS(Clack As Mat appy): <br /> ❑ 5. DAILY VISUAL MONITORING OF PUMPING SYSTEM;TRIENNIAL PIPING INTEGRITY ❑ 5. DAILY VISUALMONITORING OF PIPING AND PUMPING SYSTEM <br /> TEST(0,1 GPH) ❑ 8. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING) SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPINI <br /> ❑ T SELFMONITORING ❑ T. SELFMONITORING <br /> GRAVITY FLOW'. GRAVITY FLOW(ChacA aI Melappty): <br /> ❑ 9. BIENNIAL INTEGRITY TEST(0.1 GPH) ❑ B. DAILY VISUAL MONITORING <br /> ❑ 9. BIENNIAL INTEGRITY TEST(01 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Clack as Mail applD' PRESSURIZED PIPING(Clack ala Mat appy): <br /> 10 CONTINUOUS oIM)i )US TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10.CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL ALARMS AND(Oack one? <br /> IDnN <br /> ❑ e. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑ a.AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑ b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑ b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM DISCONNECTION <br /> DISCONNECTION <br /> ❑ c. NO AUTO PUMP SHUT OFF ❑ u NO AUTO PUMP SHUT OFF <br /> ❑ 11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPX TEST)WITH FLOW SHUT OFF OR ❑ 11.AUTOMATIC LEAK DETECTOR <br /> RESTRICTION <br /> ❑ 12.ANNUAL INTEGRITY TEST(0.1 GPH) ❑ 12.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTIONIGRAVITY SYSTEM: SUCTION/GRAVITY SYSTEM: <br /> ❑ 13. CONTINUOUS SUMP SENSOR I AUDIBLE AND VISUAL ALARMS ❑ 13. CONTINUOUS SUMP SENSOR I AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(CMck ala Mat apply) EMERGENCY GENERATORS ONLY(Clack ala(hal appH <br /> ❑ 14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF 4 AUDIBLE AND ❑ IC CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF;AUDIBLE AND VISUAL <br /> VISUALALARMS ALARMS <br /> ❑ 15 AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW SHUT OFF OR ❑ 15. AUTOMATIC LINE LEAK DETECTOR T3.0 GPH TEST) <br /> RESTRICTION <br /> ❑ 16. ANNUAL INTEGRITY TEST(0 1 GPH) ❑ 18 ANNUAL INTEGRITY TEST(G 1 GPH) <br /> ❑ 17. DAILYVISUAL CHECK ❑ 17. DAILY VISUAL CHECK <br /> UNI.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT ❑ 1 FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑ 4. DAILY VISUAL CHECK <br /> DATE INSTALLED ❑ 2. CONTINUOUS DISPENSER PAN SENSOR;AUDIBLE AND VISUAL ALARMS ❑ 5. TRENCH LINER(MONITORING <br /> ❑ 3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR DISPENSER;AUDIBLE AND VISUAL ALARMS ❑ B. NONE <br /> IX OWNER/OPERATOR SIGNATURE <br /> I m"Mat Me inMMra9M proviGE herein is true ala aca9ma to Me MM of my M owassl . <br /> SIGNATURE OF OWNERIOPERATOR DATE <br /> NAME OF OWNER/OPERATOR(p" TITLE OF OMMEP/OPERATOR <br /> P.Nw (Far kcal uas Proy1 Penna Appn (FO,Mcal MH,0My) Parma ExpkaMn OMB(Por Nealuu-W <br /> .I <br /> CUPAFORM(4199) Formerly SWRCB Form B <br />
The URL can be used to link to this page
Your browser does not support the video tag.