My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
11/4/2018 4:35:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\COMPLIANCE INFO 2012-2015.PDF
QuestysFileName
COMPLIANCE INFO 2012-2015
QuestysRecordDate
5/19/2017 9:21:29 PM
QuestysRecordID
3390491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> F.In-Tank Gauging/SIR Equipment: W Check this box if tank gauging is used only for inveMMq{trZL 14 i <br /> r Check this box if no tank gauging or SIR equipment is <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. ENVIRONMENTAL <br /> HEALTH DEPARTMENT <br /> Complete the following checklist: <br /> YesjNo- Mwiringut wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Yesnk gauging probes visually inspected for damage and residue buildup? <br /> Yescy of system product level readings tested? <br /> Yescy of system water level readings tested? <br /> Yesrobes reinstalled properly?Yesms on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> • yes No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check al/that <br /> apply)Simulated leak rate:�3 g.p.h.; r 0.1 g.p.h; �0.2 g.p.h. <br /> N/A <br /> • Yes No* ere all LLDs confirmed operational and accurate within regulatory requirements? <br /> • Yes No* as the testing apparatus properly calibrated? <br /> • Yes �' No* For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> N/A <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> • N/A <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> • N/A <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> 1: N/A <br /> Yes No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> • N/A <br /> • Yes No* ere all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.