Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN —PAGE 1 (One form per facilil > <br /> TYPEOFACTION ® I.NEW PLAN ❑ 2.CHANGE OF INFORMATION R01 <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> Valero#3698 <br /> BUSINESS SITE ADDRESS ren. BustNESS SITE CRY nw. <br /> 153 E. 1 j1 Street Trac <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any mlease(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the USTsystem. <br /> • Any release to secondary containment will be pumped or otherwise removed within a lune consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Rmovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> i Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR 566262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a property labeled and sealed conlainer. Waste material shall be disposed of <br /> appropriately. <br /> D Facility personnel will determine whether any water removed from secondary containnunt systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> $66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e,rainbow colors),it is contaminated. A thick Boating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> D We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondarycontainment. <br /> IH. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and dean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equiputent is inspected at least monthly,and after each use,supplies are mplenished as needed Defective eplipnwnt is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE,BUT AVAILABLE.FOR USE IF NEEDED: (Complete only if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> an. 8211. kin. <br /> Ru. Ret. R31. <br /> R12 R22. R32. <br /> RI3. R23, a/.i. <br /> R16. R24. RM. <br /> RI5. R23. I05. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. TITLE Rsn. <br /> Ja tar Gill Manager <br /> NAME R+1. TITLE Its 1. <br /> Don Marcetti Area Manager <br /> NAME R42. TrrLL•' R52. <br /> Sandy Huff Compliance Coordinator <br /> NAME RO TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE.STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ®1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ®2. INSPECTION BY QUALIFIED PERSONS ®3. RECALIBRATION OF EQUIPMENT W. <br /> ❑99. OTHER(Specify): 1161. <br /> UN-022B-1/3 www.unidm&org Rev.04102/06 <br />