My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
315
>
2300 - Underground Storage Tank Program
>
PR0231387
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:49 AM
Creation date
11/4/2018 4:39:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231387
PE
2381
FACILITY_ID
FA0002996
FACILITY_NAME
TRACY USD-JOINT UNION HIGH
STREET_NUMBER
315
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23337009
CURRENT_STATUS
02
SITE_LOCATION
315 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\315\PR0231387\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ( .r • ( ,,� • . <br /> ea n•. SAN JOAQUIN COUNTY <br /> r.'' � �, COMMUNITY DEVELOPMENT DEPARTMENT <br /> .*SAN <br /> < <br /> 1610 E HAZELTON AVE.STOCKTON•CA 95205 <br /> •��tNA ba��' DEVELOPMENT SERVICES PHONE(2091468-3120 <br /> PLANNING PHONE 12091 466.3120 <br /> BUILDING PHONE 12091468-3123 <br /> NEIGHBORHOOD PRESERVATION PHONE 12091468-3021 <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 3tF F 11th StrPPt , Tracy CA c3Sg76 <br /> Owner Tracy Joint Union High School DistP.hone No. ( 209) 831-5032 <br /> Contractor Wright Environmental Phone No. ( 209)833-075H,icense No. 651501 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> 2. Submission of verification, e.g. load ticket, within 30 days of project <br /> completion that one of the following materials was placed in the excavation in <br /> 12" lifts: <br /> A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br /> inch in diameter. <br /> _ B. Crushed rock - self-compacting material not more than three-quarters <br /> (3/4) inch in cross sectional measurement. (Use of crushed rock <br /> will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or <br /> similar materials. ) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix chapter 70. <br /> * John F Lynch <br /> Name (Print) <br /> P ident <br /> le (Pri t) <br /> _4� <br /> i nature <br /> * Shall be the responsible managing em oyee on the license or authorized <br /> agent. <br /> 6/91—LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.