My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
315
>
2300 - Underground Storage Tank Program
>
PR0231387
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:49 AM
Creation date
11/4/2018 4:39:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231387
PE
2381
FACILITY_ID
FA0002996
FACILITY_NAME
TRACY USD-JOINT UNION HIGH
STREET_NUMBER
315
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23337009
CURRENT_STATUS
02
SITE_LOCATION
315 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\315\PR0231387\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tracy Joint Union High �KOOI District <br /> Health and Safety Plan UST Removal <br /> WES Project No. 4028-T Page 1 <br /> December 2, 1993 <br /> SECTION 1.0 INTRODUCTION <br /> The health and safety of all project personnel involved at the 315 E. Eleventh Street <br /> underground storage tank excavation project is of primary importance. Therefore, this Health <br /> and Safety Plan was developed and is intended to be followed by all project personnel. It is the <br /> responsibility of the Project Manager to implement and enforce the plan and any subsequent <br /> revisions, during the course of all operations at the site. <br /> 1 . 1 OVERVIEW <br /> Tracy High School District has retained Wright Environmental Services, Inc. (WES) to perform <br /> the location and removal of one (1) underground storage tank at the site of 315 E. Eleventh <br /> street, Tracy Joint Union High School Distirct, Old Transportation Facility Tracy, CA. The work <br /> will consist of: removing underground storage tank (UST) and the associated piping. The <br /> removal of this tank involves six basic steps: <br /> 1. Draining/cleaning of all liquid from the tank and all associated lines. <br /> 2. Capping or removing associated lines <br /> 3. Excavation and removing the tank from the ground. <br /> 4. Freeing the tank of toxic vapors <br /> 5. Disposing of the tank <br /> 6. Backfilling the excavation hole. <br /> The chemical hazards expected to be encountered at the site of 315 E. 11 th street are organics <br /> and metals from fuel oil. The other hazards expected to be encountered during the project are <br /> exposure to physical hazards such as slipping, tripping, cuts, strains bruises, smashing limbs <br /> from working around heavy equipment (pinch points), excessive noise, broken bones and heat <br /> stress. The project work is scheduled to begin on December 20. 1993 and last approximately <br /> ;;_days. The tank capacity and contents are listed below: <br /> CAPACITY (gallons) CONTENTS <br /> 1 1000 DieselFuel Oil <br />
The URL can be used to link to this page
Your browser does not support the video tag.