My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
2300 - Underground Storage Tank Program
>
PR0231390
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:49 AM
Creation date
11/4/2018 4:47:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0231390
PE
2381
FACILITY_ID
FA0003214
FACILITY_NAME
EASTGATE BUSINESS PARK*
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\757\PR0231390\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br />PUBLIC HEALTH SERVICES <br />SAN JOAQUIN COUNTY <br />JOG] KHANNA M D., M.P H. <br />Health Officer <br />P.O. Box 2009 • (1601 East Hazelton Avenue) • Stockton, California 95201 <br />(209)46&3400 <br />APPLICATION FOR PERMIT TO CLOSE <br />UNDERGROUND STORAGE TANKS STORING HAZARDOUS MATERIALS <br />GENERAL INSTRUCTIONS: <br />Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be <br />returned to the applicant with comments. <br />[ ] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, <br />streets, adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water <br />wells, buildings, underground public utility lines (including water, sanitary sewer and storm sewer), <br />and distance of piping from tank to dispensers. If underground utilities are not included on the site <br />map, you must state in writing that USA Dig will be contacted prior to excavation activities. <br />[ ] 3. Complete page 3, "Application for Underground Tank Closure Permit". <br />[ ] 4. Complete page 9, "Authorization to Release Analytical Data". This form must be signed and dated <br />by the OWNER/OPERATOR of the facility. <br />[ ] 5. Submit the appropriate fees and complete page 11, the "Underground Tank Program Fee Worksheet". <br />[ ] 6. Complete all questions on page 10, the Public Health Services -Environmental Health Division <br />(PHS-EHD) "Underground Storage Tank Disposition Tracking Record", except those requiring a <br />signature and date of tank removal. The holder of the permit shall be responsible for ensuring that <br />this form is completed and returned to PHS-EHD within 30 days of the tank removal. <br />[ ] 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential <br />hazards for this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br />[ ] 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required <br />by the County of San Joaquin Building Department and the incorporated City Building Departments, <br />pursuant to the Uniform But'Iding Code STD 70-11. <br />[ ] 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to PHS- <br />EHD approval of the closure plan. <br />[ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately <br />completed plan. If gross deficiencies are identified, an addendum will be required with a $78.00/hour <br />fee and the review will begin on the date of resubmittal. <br />[ ] I1. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br />[ ] 12. Advance inspection notice of at least 48 hours is required by PHS-EHD. <br />EH 23 007 (Revised 11/1/92) Page 1 <br />A Division of San Joaquin Counry Hca1N Care Scn+ 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.