Laserfiche WebLink
� Y <br /> BASSETT CONSTRUCTION INC. <br /> 7730 GREENRIDGE WAY FAIR OAKS, CALIFORNIA 95628 <br /> (916) 967-7424 <br /> CA UC. 0394896 <br /> TANK REMOVAL PLAN <br /> TANK RINSE: Tank to be rinsed by Bassett Construction Inc. , and <br /> Rinsate to be vacuumed out by Placer Tractor Service, <br /> and hauled to Refinery Services. <br /> SOIL SAMPLING: Soil samples to be taken from between 2 ' to 4' below <br /> tank bottom. Soil to be removed by backhoe and samples <br /> to be taken from backhoe bucket . <br /> SOIL SAMPLES if any product pipelines exist, soil samples to be taken <br /> PIPELINES: every 20 linal feet of pipeline. <br /> TANK LEL LEVEL: Tank to be checked with _a hydrocarbon detector <br /> before removal to determine safe LEL level . <br />