| 
								           																																		F 4�
<br />   																																			�
<br />    																																																																																										4 .
<br /> 																																																			b)      	(WAOR4460A  ft
<br />																														2. 5      Contractor  is  cQapornay�, rao."i'll,t�    			1,J   												1.    "   1. 1 1 1 1  f
<br />    																																					Ringing,       if, tho )L41t   �si%w,'pt the
<br />   																															tank  bottoms  and, 							where  (squired,    							grv,�     tie   !I   																												ZZZ
<br />   																																																				40 of
<br />       																																																								-    	goo
<br />    									KWC-��		to  Gonerfu  Cootrqctor  ondlor  Subcontractor  is  deflated  by      							This  must  be  occonipirshed       	prior  to			Contractor    							Insert  the  h6tei '!Allo  the   	discoboric   t 0, 																							R
<br />   																															shall  use  o  rosco  oppro"d  Company  to  preform '01's  'Aork�  The      												b 1)    ole  from  lild  pr;mdr       																					0�"__R:11.
<br />   																															recovered  mat(orial  and  rinsoto  shqlf  be  managed  dc4ording  to  Local,      							secondary  took,
<br />   																									a     					State, and  rOdeoQI  codes  iind  regulations.  The  material  niust  ba  fallen  to      					d)      Prdssdrato  th  5  riilig.  Aold  or  (ehlove  air  via  I       																							NRI
<br />    									0i     Co�tri;l4to�r  5haIl  be  responsible  to  completely  fornifIcIrioto  itself  with  existing  sit       																										valve  as  needed  and  allow  pressure  to  stobili
<br />   										cono,tiorls  a     																																							the  Volvo  on  the  teat  roorlifold  to  the  air  $up
<br />      												no  oil  applic,pblo  fedoirdi,  state  and  !doll  aws,  codes  and    							a  rofility  that  is  approved  b   Tosco.  The  fosco  Construction  Manager
<br />   																															MUST  sign  an  waste  ni  $iee  bid  dQuunnerks  far a  list  of  these
<br />   										f'oqulcflons.    Alt work  and  materials  shall  be  in  accordance  with  these   																												Qt!  ro   	aa      _o�
<br />													If  there  is  u,  Conflict  w;thln  these  documents or  between  these  						approved  site$  and  companies.
<br />  																																																				Monitor  the  pressure  for  I  hour,  soap  (he  enti
<br />   										4actoolents  (Ind  site  condition$  and(or applicable  laws,  Codes  or  regulations,  																																				to  exteoio�
<br />   										the  Contractor  is  responsible  to in   mo  the  Tosca,  Construction  MkintiqlIt  Pride      				2.4     Contractor  il responsibe  for the      														of  the  tank  qhd  vutch  foe  ocf;ve  ah,  btbbles  which
<br />       																																					proper  transportation  and  Ofspolal  of  						a)
<br /> 																	a
<br />    					ta,
<br />									it 	to  bkf�  NO    	coy  will  be  made  for  his  f    																																	indiCats  a  leak.
<br />       																		allure  to  4Q go,   									oil  old  tanks  that  ore  removed  as  part  at  this  projeCt,  Contractor  must
<br />     		t,f-
<br />   																															proyffle  peolf  of  proper  transportation  and  disposal  at  on  approved       							When  the  ta�t  is  complete,  slowly  release  Qir  pressure
<br />     	I,i`�'  -      																																																																I    ,
<br />   										Cortr Clot  shall  handle  and  install  of  items  per  manufactures  instructions,    						facility  in  the  form  of  a  signed  <iertiflroto  of  offadovit  of  ?raper    								from  the  took  by  disconnecting  the  supply  line  arid      						N
<br />   											a																												L)ecyth  Cernficglil )�  This  								opening  this  supply  valve  On  the  test  manifold,  When  oir
<br />    										those  JrqW,r'qA,  Ord  oil  Iowa,  codes  and  regulations.       										disposal  from  the  tank  disposal  facility    																														a    																		0
<br />   																															ceFflficate  must  be  included  In  the  project  close  out  folder  a$  oillilinod  							flow  from  the  supply  valve  stop$,  remove  the  test  onorifold.
<br /> 									4.0     Contractor  iholl  not  deviate  from  materials  or  prolOucts  specified  unless							in  section  K-1.0  Consult  bid  documents  or  toace  Construction  Manager
<br />    										trirallah  (nufull agroarnent  with  rosco  Construction  Manager.  Approval  must    						for  specific  local  information  regarding  this  issue.    							1.0     INSTALLATION																															s*
<br />    										be  IN  WRITING,  signed  by Toescue Construction  MonOq 	Of  submitted  in  the
<br />    																	in  Sec.  1.0  �  Substitute  materials  shall  be  			10      When  Jeterenined  safe  by  the  rosca.  Construction  Mqhaqor  and  local    						7.11      lostolling  contractor  shall  be  certified  by  tank manufacturer  on  lirope�
<br />    										project  close  out folder  as  outlined       																			less  than  10%  of  the  Lower  Expiation  Limit    					took  Installation  procedures.
<br />       																																																																		i I
<br />    										40acribad,  specifying  any  difference in  cost  and  perforindrice,  Only  new						rl$pector,  if  present.  degoe  tank  to  																																	to
<br />    										materials  shelf  be  used.  Contractor  shall  be  Certified  for  the  installation  of  oil    				ML)  by  inserting vapor$  by adding  0  relleithourn  of  1,5  [be  of  dry  (co  per  100
<br />   																																																															Ice  and
<br />    										equipment  and  materials  contained  in  this  project.       									gciltorls  of  tank  copacjky  or other approved  method  allowed  by  local Cole  With    				7�2      Bedding  and  bae.kfiJI  mo (4riql  shall  be  Well  washed  and free  of  i
<br /> 																														Nfittore  approval  from  the Toisco  Construction  Manager,    										snow  and  onqst ASrM  D-448,  ASfoM  C-33  arid  AA$HtO  M-4�  for  quality
<br />  									5,9     Contractor  3lioll  secure  all  required  permits  prior  to  commencing  Work,    See      																									and  scund,nsq.  Coobejetor  shall  provide  sieve  andlysis  qrceptable  to
<br />       																																																								he  tank  warranty  is  alitornOtic011Y Voided
<br />    										bid  documents  for  list  of  permits  that Toscor  will  pay  directly,  Contractor  to      			4.0      Excavate  to  took  top,  remove  all  tank  appurtenances,  plug  ill  Opefiirlqa�							toser,  Cronstruction  Manager.  I
<br />  																																																													of  bockfili  inoWdqfs
<br />    										pay  fees  for  all  remaining  parrents,  and  insp"tiona  not  Included  on  the  flat.					remove  tanks  arid  place  In  d. secure  location. 												if  material, olthor  than  the  fofloNinil  approved  bed  on
<br /> 																																																										pprovol  from  the  tank  frojouforiture?.
<br />    										Contractor  shall  coordinate  all  inspections  reouired  to  Complete  this  project,       																									are employed  without  prior  written  a
<br />       																																																																				�rpt
<br />       																												Of.0     Remove  ronlod�ning  proleduct  and  vent  piping  frorn, $Ito  at earliost  time  Possible,    																							1,
<br />   																								a     					i  required-       																		7,2A   Poo  				iZe  not  less  than  1/8'  or  more  than   				4'
<br /> 																																																					'grovel  with  particle  si
<br />  									6,0     Ail  existing  items,  except  these  that  ore  to  be  removed  and  junked,  sh  11  be
<br />       													Contractor.    Contractor  shall  replace  any  and  all  items  that       																										3/4   diameter  with  no  more  than  5%  passing  a  No.  8  sieve,
<br />    										protected  by
<br />    										ore  removed  or  damaged  during  the  Course  of  his  work,  to  the  same  or 				6.1)     For let-  round  beetling  and  used  oil  tanks,  follow  8-2.3  through  B-5,0.  as
<br />     										beetter  condition,  at Contractor  expense.    Consult  bid  documents  for  list  of  					lop icobt,    Some jurisdiction$  may  have  classified  used  oil  as  hozardotid,     						7.2,2   Crushed  stone  with  Portice,  size  out  less  than  t/8'  or  mots  than			I'D
<br />   																																																				1/2'  diameter  with  no  rhoro  than  5%  passing  0  tire.  8  *VIE
<br /> 																														we   								-2,3)    																															Q    u"
<br />    										equipment  that  will  be  salvaged.       													ate  and  must be  managed  as  such  i5els  8   																																	RP
<br />   																																				iteJ  with  an  environmental  consultant  to    					1.3     STANDAR
<br />    										Contractor  Is responsible  for  blue  3taking  the, excavation  areas  and  locotin				110  																																											At
<br />   									7.0    															Oil   				A Aeporats  contract  Will  be  exec  																0  INSTALLATION;    PROCEDURE  -  DRY  HOLEt 							2.0
<br />     										underground  utilities.      															perform  an  environmental  site assessment.  tosco  Construction  Mrinoger
<br />    																														id/or  Consultant  shall  inspect  open  excavation  far  evidence  of  a  hydrocarbon     					1.,3,1   Place  minimum  12"  beddIng  material  smooth  and  level  over
<br /> 																														an
<br />  									8.0      These  plans  ore  schematic  only.    General  scope  is  defined,  however  FOSCO  					retelqse.  Any  soil  disposal  required  will  be  handled  on  a  separate  contract  or   							excavation  floor.    TANK  TO Be  SET  LEVEL     							10     W,
<br />     										�eserooes  the  right  to  alter  or  expand  the  scope  of  work.    Togoo  will  direct 					allarge  ortlee,
<br />     																																																								ddinq  reloterial.    Use  all  lifting  lugs  provided
<br />    										and  pay  for any  additional  work  under separate  contract  or change  order,  																										7.,�,2   Set  tanks  level  on  be
<br />   																																																																											K
<br />   																																																				and  golole  edges  at  each  tank  slid.    Do  not  set  tanks directly
<br />       																																																																						vnlsq,-,W�
<br /> 																								a     r  I      																										on  d4oulmen  or  coocrele  slab  If  used.  Measure  tank  dioiniter.
<br />  									9.0      Contractor  to  warranty  all  workmanship  and  Contractor  supplied  rnotteri  I  in  				�A'Ah�N
<br />     										year,  with  the  exception  or  the  underground  storage  tank  installation,  Tosco
<br />     										shall  perform  a  10  month  warranty  inspection  to  evaluate  Contractor 					1.0     Controctor  shall" fellow all  OW  specifications  and  repulctrons.  all  Federal,  state    					7,3.3   Place  12"  baci  material  Overly  around  tanks.    Use  WOODEN
<br />     										performance  and  qualit   of  workmanship.  Contractor  must  complete  (311  punch     				and  Local  codes  (Ind  regulations  and  the  tank  mo3ou oacturar's  Installation 								dowel  probe  to  work  backtill  Completely  under tank  between  ribs     							RA
<br />  																														rylondol  regarding  excavation.																					Use  extreme  care  In  bockfilling  berieuth  tank     															t
<br /> 															ng  this  10  month  inspection.  The  underground  storage       																										arid  under  endcops,       															j% 		5
<br />     										list  items  identified
<br />     										tank  installation  sholl  be  fiarrantided  as  outlined  in  section  0-7.9. 																													bottom,  between  ribs  and  under  end  cap$  to  Provide  0  solid     										to�p
<br />																													�1.0      Excavation  shall  be  sized  per  funk  manufacturer's  guidelines.    										support  free  if  voids.  It  is  extremely  important  that  core  be    						be  troioltq�l,by caolirl`4
<br />   									10.0    Quatractor  &half  keep  the  site  free  of  waste  arid  rubbish  at  all  times.   																												exercised  in  the  backfilling  of  the  took$  up  to  two  feet  in  4opth       					oiloppinq  with  felt  or  �M  to
<br />      																																																																											4-1
<br />     										Contractor  SHALL  HAVE  THE  WORK  AREA  PROFESSIONALLY  CLEANED  THE  DAY       			3.0      rosco  reserves  the  right  to  design  anallor  construct  sharing  tinder  on      								from  the  took  bottom  as  tank  failures  have  resulted  Where  voids      					corrosio to  free  Prior to,....004
<br />     										BEFORE TOSWs  FINAL PROJECT  INSPECTION. 											amended  ageoement  With  Contractor or  separately  with  oraLhor  company.  If      							4ofs  evident  under  the  tanks.  0ood  Compaction  Ono  support  The
<br />  																														resod  ongdget Contractor.  Contractor  shall  submit  sharing  design  to  Tosco      							the  tank Con  be  obtained  by  shaping  the  qeavel  with  a  shovel  all   				3_5     AIP
<br />     																																																																									If
<br /> 																																																																								I
<br />   									11.0    Qcentructor  to  Provide  W  chain  link  Security  fencing  and  barricades  during  at$      				Construction  Moreoger  for approval.    Supplemental   olly,  scope  and cost  shall  be							around  the  perimeter  of  fatch  tank,
<br />  																														4greed  to  in  teems  of  a  contract  change  a  	dor  to  Commencing  work. 																										-The
<br />     										i;onstruction  phoseig,  or oo  directed  by Tqsco  Construction  Manager. 																																																			��fg I-U
<br />  																														Jildring  shall  be  removed  prior  to  Installing  product  piping  unless  approved  by       					I.J.It   Re  out  0-1.3.3  for  next  12",  probing  to  rill  all  voids  at  the   								r
<br />    																																																																					3.4
<br />  																														the  Tosco  Construction  Manager  to  abandon  in  Place.   												f,     																					AM
<br /> 																																																					Clef  5  to  I  o'clock  support  areas  of  the  tank,
<br />   									12,L)   When  an  installation  is  mass,  at on  existing  store,  Ole  Contractor  is  to
<br />      																								-store
<br />     										schedule  and  perform  tile  work  so  as  not  to  interiors  with  the  normal  C      																																				dditielool  probing
<br />     										operotiQni.  All  debris,  excess  excavation  materials,  machinery  and  equipment  to			4..J      unstable  sails  troy  be  required  to  have  a  filter  foltord,  hole  trort  Consult  bid 						7_5,5   Freely  Odd  additional  backtill  to  tank  tops.    (A
<br />  																																																																				f.0
<br />     										be  removed  (Ind  rrittintolvel;1  clear of  the  driveways  that  are  in  use  each  day      				Jogum-antai  or Tosco  Construction  Morager for  specific  information  regarding    							not  required.)  Measure  tank  diomater�
<br />     										ind  lighted  barricades  shall  be  provided  for  the  publics  protection.    When  it       				this  ;ague,
<br />     										�daorfe$  necessary  to  close  a  driveway  for  mote  than  24  hours,  the       																									7,4      INSTALLATION  PROCEDURE  -  WET  HOLE											fhl      Insta[fli
<br />																													5.j      Minimize. surfqcs  water  entering  excovitiQns  by constructing  diversion  dome
<br />     										,;ontro"Ptor  will   rovide  tomporory  travel  service  for  traffic.  Contractor  TO
<br />     										0i  A  T    !I     			THE  START  OF GASOLINE WORK,  per  Tosco       				nortured teri  oixetryation  and  piping  trenches,     											7.4�1,  The  following  procedure  shall  apply  Where  high  eaboar  table  Is  					4,2
<br />     										,;Onstruction  Managers's  instructions.       																																		0,41dont  or  where  a  future  wutot  condition  I$  aniftripated.    							Peg   sV'111
<br />																													0.0     A  contingency  plan  shall  be  developed  with  Togo  Construction  mr(Iredger   																																															Sig
<br />    									I.t.0    I;vaterpCtor to  keep  on  site  Moteriql  Safety  Doll  Shoals  (MSUS)  for  chemical					autilroino  emorlerly  procedures  for  Obtaining  the  necessary  equipment  ond/'Or						142  Water  level  should  be  mointoftied  (it the  lowest prockiCal  level
<br />     										�ompoands  regulated  thro   In  USEPA  that  will  be  used  on-site  or  has  the  					personnel  to  hand 0  orgoopoeted  water  on"  Into  the  tank  field  excovqtiorl  or   							during  installation,  A sump  and  Pump  Or  a      tom  of  Well  points
<br />   																																									Consult  Tosco    								and  pumps  To  the  recommended  method to  minimize  Water  level       					preo I
<br />     										potential  for human  contal.  (1.9,,  Gasoline,  Dry  Ice,  Solvents,  Glues,  etc.)   					piping  lrefocfais�    When  walor may  contain  hydroognboills,     																														'.a   1.4.
<br />   																														Construction  Manager prior  to  removing  it  from  site, 												in  the  hole.    it I$  recommended  that an  experienced  olewoteriog
<br />    																																																				Contractor  be  employed  to  dewuter  the  excavation.  The  type of						cent
<br />  																																																														0  Into  the    							�  IT
<br />    									14.1.)    �ootracftor  shall  place  the  highest  priority  on  safety  and  health  during  the     																																														Tit No
<br />     										progress  of  work  performed  at  Tosco  store  locations.    It  shall  be  the   																												system  required  will  depend  on  the  Alotor flow  rat
<br />       																																																																						if
<br />     										responsibility  of the  Contractor  to  provide  and  maintain  u  safe  working   			D�	TAN K     																						hois,  The  hole  bottom  should  be  level,  free  of  rocks  and  debris.
<br /> 																														I�S_T�c�T
<br />     										environment  for its  employees  dlyring  the  progress  of work  and  to  protect  the
<br />      										Nealth  and  sofet   of  uoreep,ictors a  agents,  subcontractors,  the  public  and  any   			I'D     Contractor  shall  Coordinate  delivery  date  of  tanks  with  the,  manufacturer,  rolco     					7.4_3   Provide  a  minterwron  12"  thick  pea  grovel  bed  at  bottom  Of  hole.  				QONNIE01�0r*      10`2 1-1
<br />      										third  porttee.      1� tools,  moterletis,  equipment,  facilities  and  other  items  used  by 				Construction  Manager,  and  the  project  schedully.													Pea  grovel  must  be  efroded  smooth, compootold  and  level  to
<br />      										the  Conteoctor and  practices  employed  by  the  Contractor  in  accomplishing  the      																										receive  looks,    Carefully place  tanks  on  pea  grovel  bed. 						5,1      Npf  ful
<br />      										*Ork  Ole  considered  to  be  part  of  the  working  environment.      						ZA)     Tank manufacturer's  installation  procedure  shall  be  followed,  and  the  i(sallauOrl      						TANK  15  TO  BE  SET  LEVEL,
<br />   																														Checklist  shall  be  initioled/stognad  by  Conthqctor  and  i  Construction
<br />       																																																																								6 1�
<br />   																																																			7.4.4,   BALLASTING:																		I
<br />    									lCot)    'While  on  site  and  during  working  hours,  Contractors's  personnel  must  wear 					Manager,  as  appropriate   as  each  step  is completed.      																															90
<br />      										shirts,  lung  pgnts,  hard  hats  when  required,  and  acceptable  foot  wear  per
<br /> 																													10      Ail  underground  equipment  installation  affidavit  shall  be  filled  out  by  Contractor       						7�4.4,1 It  water  is  required  to  sink  tanks  ill  high  water  talbelo
<br />      										OSHA,  ragalotions.
<br />   																														4nd  submitted  to  the  Tosco  Construction  Manager In  bound  project  close   									Condition,  the  manufcirturer's  tank  installation  instructions
<br />    									Id,O    Contractor  must  provide  adloquutoy  provisions  to  mitigate  rain  darriage  and   					out  folder  (see  soction 																			must  be  adhered  to  exactly.
<br />      										jeloys,  (;.e.  pumpso,  turps,  etc.).   												4.3      Lifting  equipment  shulI  be  adequato  to  handle  tank  without  dragging,    Use  Oil  							7.4, $.2       r  within  the  tank  cannot  W  at  a  hiq�olr  level  than  the     					if, 1     i,"I     																ItIA
<br />    									11.0   Contractor  is  responsible  for  coordinating,  receiving  and  unloading  oil  TO$" 					'fillm   lugs  and  guidelines  When  tilling  torlks�    Rest  tanks On  smooth  and   									=dos  ground  water.    If  water  is  required  to  rocks  tank
<br />      										supplied  equipment  delivered  to  Contractor's  warehouse,  or job  site,  The      					J03  free  ground.    Chock  tanks  to  prevent  ralflog  and  to  them  down  if  high  								Installation,  the  Con,  will  be  responsible  to  make
<br />												9  of  equipment  remains the  Contractor's  retrinsibility  until  the  final 					winds  are  expected.    Use  rnin;murn  1/2'  diameter  nylon  Or  hQrnp  rope)  Over      								oroorogemOnts  for  and  pay  for  (ill  noter  used,
<br />      												geuqgle  is  paid.  Contractor  to  distribute  Of  receiving  documents  to					tank  and  tie  to  wooden  stakes  of  adequate  Ill$  to  prevent  tanks  from  being
<br />      										see'llin  rot								I
<br />      										project
<br />      										(he  rosco  Construction  Manager.  If  TG3CO  Construction  ManO  or  is  not  						toved  by  high  winds.    00  NOT  ORAG,  ROLL,  OR  IMPACT  TANKS.										1.4.4.38oiloat  tanks  using  potable  wotar�    Remove  water ONLY
<br />      										notified  one  seek  prior  to  the  start  of  curgtructlorl�  the     p? cement  of  any   																												after tank  slub  is  cured.    Consult  rosco Construction
<br />       										niss;ng  equipment  will  be  tile  responsibility  of  the  Contractor.    						5.0      rank  shall  be  placed  according  to  the  tank  manufacturer's  installation  mqnuul    								Monager  for  proper disposal  Of  water  removo(t from  tank.
<br />    																														jgd  the Tri  tank  drawings.  Please  note  that  if  the  soil  is  unstotest,  the     																																							k
<br />    																																																															-0"
<br />    																																																																							P
<br />    									1 og,0    I�qotractor to  provide  oil  materials  not  listed  on  the  equipment  ffat  on  Page       				atiOndordo  may  be  increased.  Glatorce  between  trolks, shalt  be  governed  by     						7.4,5   eii  evoillng  tanks.  insure  that  minimum  distance  Of  2'								1-,
<br />   																														Monwfarturee's  or  State  Ind  Local  requirement
<br />      										4  of these  tie  																												is  greater.									between  idnk$  is  maintained.   When  anchoring,  place  straps over
<br />   																																							a  whichever    																													61 												'wv
<br />   													owings.  but  required  for  a  complete  job.   																															tanks  ond  follow  procedure  as  outlined  hereinafter,
<br />    									19tO   Contractor  is  to  schedule  oil  subcontractors,  including  those  contracted  directly 			d.0      ORE-INSIALLAi  TANK  TESTING.   																																		5,	to n eohl
<br />      										with  Toaco.  to$co  will  provide  list  of  subrontrqctors,  contacts  and  phone     																										r.4.0   ranks  must  be  anchored  with  doodmatere  on  all  wet  hole
<br />   																																							a  pro-irstqilotforl  tank  testing.    							inatelictlors.    Anchoring  shall  be donly in  accordance  with  the      							ino�-fqfoo
<br />      										numbers,  that  have  contracts  directly  with  Tosco. 										0. 1      Tosco  Construction  Manager  shall  witnes
<br />     																																																				tank  manufacturar'3  installation  instructions.  											roi 1 , 411     																		oft
<br />     									Z0.0    \  copy  of  the  speciticutioris  and  drawings,  along  with  approved  site  plan,    					d.2     Contractor  shall  notif   Tosco  Construction  Manager  two  working  days
<br />       										,w/ot-boilt  notations)  shall  be  on  site  at  all  times.       										prior    		nd Tank  installation.     												1.4.1   Us$  preformed  fiberglass  hard  down  stop$  furnished  by  tank
<br />  																																																												Do  not  lose  stropa  or
<br />      																																																				f0ricotor on  top  of designated  ribs.
<br />    									21.0   Contractor  is  responsible  for  all  product  in  tanks  and  in  lines  until  location 					6_5     Tanks  are  to  be  set  level  and  baclifliled  to  top  of  tank  the  Same 								cables  against  the  took  shelf  between  ribs.    Attach  hold  down
<br />       																																																								a  with  1/2'  did.  fixl[9  ptow  steel  wire  rope
<br />       										reopens  for  gasoline  business.    Any  product  loss  during  Construction  shall  be						joy  as  testing. 																		strop to  anchor  point      														q
<br />       										the  responsibility  or  mos  Contractor.    Prior  to  project  acceptance,  Tosco  shall																											10ops  using  at  least  three  Cable  cicmpst    All  straps  should  be    							Nq pot
<br />       										reconcile  inventory  by  Computing  1 roduot  in  tanks  and  lines  to  amount       					0.4     Contractor  to  provide  tank  test  manifold  per  man"fGCturei's    									tightened  with  turnbuckle$  to  give Irniq  fit at  sfropq  to  tank  rib.
<br />  																																																													3/4"  type.    Ono  tank
<br />       										JaINered,  Shortages  shall  be  billed  to  Contractor  at  full  retail  price,								notructions  and  specifications.  															turnbuckle  did.  to  be  1  1/2'  hook  type  or
<br />    																																a)     Contractor  to  furnish  air  pressure  guy  with  0  maximum       							it  a  time  shall  be  set  on  pea  grovel  and  securely  anchored  and
<br />     									22J)    fhd  Contractor  shall  inOorrunify,  defend  and  hold  harniess  Tosco  from  uny    								full  scale  reading of  15  psig  with  I/   or  1/10  psig       								tightened  with  the  anchoring  struips.
<br />       										unct  oil  claims  for  damages,  loss,  or  injury of  any  nature  received  from  or  								increments.  Prelsoure  g1jut a  to  be, In  good  repair and  have
<br />       										sustained  by  the  general  contractor,  sub-controctor.  their  employees  or  agents    							a  aglilbratlore  date  within  A0  days  of, use.  Pressure  quogos    						4.4,t)   MOTOR  FUEL  BALLASTING:  (ALTERNATE)      										Pi   Witt
<br />       										result;nq from  the  performance  of  his  work  under  this  contract,    										damaged  or out  of  calibration  will  not  be  permitted.
<br />    																																D"      The  pressure  relief vefyo  on  the  lost  manifold  must  be    								7.4,3.lMotor fuel  shalt  only be  used  whom  approved  by  resod    							y
<br />      																																	rated  at  6  ps�q  to  reduce  the  risk  of  overpressurizing										Conorructeon  Manager.
<br />     										lk     DI�F6S�AC 0!::EX��.ST�NGTiN      																the  tank.
<br />       																																																				r.4.8,2Con1rc;ctQr  shall  regiertain  product  accountability  by      							POO    														W'
<br />     									T0640  will  Coordinate  the  removal  of  gasoline  product  in  each  existing  tank  Prior  to      				d.5      104an    Pie  Primary  (Internal)  Tank     															performing  doily  stick  rea4;rgs  as  a  precaution  against
<br />      																-7'  from  the  battom  of  such  tank.										Connect  the  test manifold  to  an  available  service  fititfol       									leaks,  CorArdetot  shall  immediately  notify  Tosco
<br />    																																a
<br />     									the  start  of  this  project  to  within  3"   																							Ing  t
<br />      																																	Check  each  remaining  service  fit'      0  all 												Construction  Manager  in  the  event  of  a  loss  (Ind  shall  be
<br />  																																																						espoosible  for  all  consequential  doni  inclvdlnj�  but
<br />      																																	fitting*  are  property  sailed,  adequately daded,  plugged,
<br />     									Only  tank  monufarturer*s  trained  and  certified  personnel  ullng  equipment  arid
<br /> 																																																																				e'V
<br />     									procedures  specified  by  the  tank  morafCciarer and  following  all  governing  rules  and       							and  tilhilefied.       																	not  limited  to,  environmental  damages.
<br />    																																b)      Pre5sunolos  the  primary  tank  to  5  psI9,  add  or  remove  air
<br /> 																																																																			I
<br />     									regulations  shelf  be  permitted  to  enter a  tank.
<br />       																																	is necessary  and  alfaw  the  pressure  to  ItolpilizO.  Close      												acceptances,  rosco  Construction  Manager  			jI,t,l      11v  .. .
<br /> 																																																							to  Project
<br />     									1.0     Disconnect  all  power  to  dispensers  and  tank  top  equipment.  											the, valve  on  the  (03%  manifold  air  sapply�  line.   											shall  reconcile  inventory  by competing  product  in  tanks  and
<br />  																																																																							,I 		re
<br />     																																	Monitor  the  pressure  for  I  hour.  Soap  lost  (using  high      									lines  to  amount  delivered.    Shortages  shall  be  billed  to    												'!P
<br />       																																	Fooming  test  solution  -  osum  test  solution  menu octured
<br /> 																																																						Contractor  dt  fu I  retail  Market  Price.
<br />     									2,0      Evacuate  product  from  tanks  and  lines:
<br />      																																	by *0n  Products.  Charlotte.  NC,  Amway  Lac  Soap.  or
<br />      																																	rproved  equal)  oil  service  fitting,  morlways  and  plugs.       																		no  after    		.... ..1,13.
<br />       										For  STP  system,  drain  the  product  Imes  into  tank  by  removing  STP
<br />     									2.1  																														indicate  a  look.       						7t5      Raer  �;Qoon,4  iod  Wrapping:  Prior  to  completion  of  backfill  a 											011
<br />       										check  valve  and  Opening  safety  valve  test  ports,  Disconnect  the  flex       									etch  for active  air  bubles  whic    											pressure  testing  tank  Coot  all.aotradible  components  exposed  to  bookfil    		t							-
<br />       										piping  at  the  $TP  and  drain  the  remaining  product  Into  an  approved    									�Qhflect the  test  manifold  to  Off  available  service  fitting.							With  coot  tar epoxy,  "folopperl   biturnallkic,  and  wrap  With  felt or  Jim 										-4
<br />       																																	_'heak  each  remaining  lervicog  filItin    (a  ensure  took  service  						tape.  A�j  components  shall  be  cleCh  and  corrosion  free  before, applying
<br />       										container.
<br />       																																	!itthl  s  ore  property  seate06  qdequaloily,  doded,  plogged, 							cootlrig�  Extend  coating  3'  onto  adjacent  VRP  components.
<br />       														disconnect  the  product  [hos  from  tank  or  low  point       								and Ighternid.
<br />     									2,2      For  auction  system.     																																			1,6      Tfur Contractor  accepts  full  responsibility  for  Proper  handling  arial  inallgitottore       											�f
<br />											and  drain  Into an  approved  container.
<br />																																'guh      th"  �qcoodary  (External)  Tank   												of  the  f1honolloso)  underground  storage tanks  and  shall  ensure  thot  good  												i,
<br />											Product  removed  from  lines  becomes  property  of  Contractor  and  may  be    							a)     Maintain  Pressure  On  the  primary  tdrok.  PlQ  'Ill  open  littili  						workmanship  prqctites  and  eqnstructlort  procedures  (are followed     											'N   T 1�,�
<br />       																																	on  tile  secondary  tank.  													regardless  of  the  inclusion  or orriesioni  of  doy  applicable  suggestions  in
<br />											used  as  rootor  fuel.
<br />     																																																			these  instructions,
<br />   												----------   																															------
<br />     																																																																		I if,
<br />
								 |