Laserfiche WebLink
SYSTEM INSTALLATION DOCUMENTATION FOR ENVIRONMENTAL <br /> YES No N/A MANAGEMENT GROUP <br /> ❑ ❑ ❑ 1. TLS-350 system installed and located per drawings, <br /> operational and properly configured. <br /> ❑ ❑ ❑ 2. TLS-350 alarms have been tested and configured at their YES NO N/A State/ CUPA forms (formally A, B, and C) <br /> proper settings. ❑ ❑ ❑ 1. Removal/Installation projects: Original to local agency. <br /> ❑ ❑ EJ 3. All tank manhole covers opened for inspection of tank copies to Environmental Consultant for closure report. <br /> equipment and sump penetrations. Copies to Environmental Management <br /> ❑ ❑ ❑ 4. Construction debris has been removed and the parking area ❑ ❑ ❑ 2. New Installation projects: Originals to local agency, <br /> cleaned and repaired satisfactorily. copies to Environmental Management. <br /> ❑ ❑ ❑ 5. Damaged landscaping elements have been replaced or Underground Storage Tank Monitoring Plans: <br /> repaired. ❑ ❑ ❑ 1. Contact designated agent assigned by SBC <br /> ❑ ❑ ❑ 6. Standby engine has been successfully tested after new Environmental Management to prepare UST Monitoring and <br /> tank cut-over. Response Plans. <br /> ❑ ❑ ❑ 7. Air and water reels located per drawings. (Fleet locations) Spill Prevention, Control, and Countermeasure Plans: <br /> ❑ ❑ ❑ 1. Contact designated agent assigned by SBC <br /> nvironmental Management to prepare SPCC plan if required. <br /> ❑ ❑ ❑ 8. Seal at the dispenser mount bracket/island interface. All above ground tanks over 660 gallon capacity, or IJSTs <br /> with total aggregate capacity over 42,000 gallons.) <br /> ❑ ❑ ❑ 9. Emergency shut-off switch located per drawings. (Fleet locations) Tank Testing Results: <br /> E] ❑ F1 10. <br /> El El 1. Provide test results to local agency and SBC <br /> 10. Commodity tags installed fill risers. Environmental Management. <br /> Closure Reports: <br /> ❑ ❑ ❑ 11. Manholes properly crowned. ❑ ❑ ❑ 1. Manifests and triptickets, Certificates of Destruction, Compaction <br /> reports, etc. to Environmental Consultant for inclusion In Closure Report. <br /> ❑ ❑ ❑ 12. Field Inspection Final Acceptance Form signed by all parties. ❑ ❑ ❑ 2. Environmental Consultant to provide and mail copies of <br /> the closure report to SBC Environmental Management. <br /> ❑ ❑ ❑ Tank Chart (from Tank mfr.) <br /> Send one copy of all documetation to: <br /> SBC Service, Inc. <br /> Environmental Management <br /> 2600 Camino Ramon, Room 3E OOT <br /> San Ramon, CA 94583 <br /> LRERATURE (To be placed in a ring binder by contractor, clearly identifying each item. Sign below to indicate attendance at Fina/ Inspection; Sign again to Indicate FINAL ACCEPTANCE of work over f7hat <br /> Outside cover to show job location and date as per sheet P-1 of drawing inspection (&4ho, In Neid If no remedial work needed, or after remedial work concluded. <br /> set.) One binder to be stored on site and one sent to SBC Environmental 4D A <br /> Management. ATTENDANCE FINAL ACCEPTANCE <br /> A. Manufacturers Warranty. Operation Manual/Maintenance DataF <br /> Facility Engineer <br /> YES No N/A (list materials received) Facility Manager } cv:•. 3c <br /> E] E] E] 1. Tanks (Tank chart & drawing by Mfr.) #C 9291 <br /> Site Manager SF 0 7 At <br /> 2. Sumps <br /> ❑ ❑ ❑ Project Manager IcOF CAL1FQQi� <br /> . ; <br /> E E] ❑ ❑ 3. SensorsContractor <br /> ❑ ❑ ❑ 4. Piping <br /> E] E] ❑ 5. Pumps Consultant REVISIONS / AUTHORIZATIONS <br /> S Environmental Management <br /> o ❑ ❑ ❑ 6. Double containment piping system NO. REVISIONS / AUIHORInTIONS DATE er <br /> n ❑ ❑ ❑ 7. Wells SUBMITTED FOR PERMIT 7/17/01 MED <br /> ❑ ❑ ❑ 8. Leak Detection Systems T CHANGE UNDERGROUND PIPING SPECIFICATION 8/29/01 MED <br /> o ❑ ❑ ❑ 9. Other: <br /> o B. Permits and Agency Correspondence <br /> PROPRIETARY SBC INFORMATION <br /> YES NO N/A NOT FOR GENERAL USE OR DISCLOSURE OUTSIDE OF SBC <br /> ❑ ❑ ❑ 10. Copies of signed permits (Health Care Agency, County or City ENVIRONMENTAL MANAGEMENT UNDER EXEMPTIONS SET FORTH IN <br /> Fire Departments and Building departments, etc. as applicable) THE CALIFORNIA PUBLIC RECORDS ACT. THIS INFORMATION MAY <br /> given to SBC Engineer ONLY BE USED BY AUTHORIZED PERSONNEL OF THE LOCAL <br /> 0 <br /> GOVERNMENT AGENCY IN CONNECTION WITH APPLICATION FOR <br /> a PER ITS AND AUTHORIZATIONS FOR BUILDINGS, CONSTRUCTION, <br /> E <br /> C. Test Results AND OR ZONING CHANGES. <br /> YES NO N/A DRAWINGS PREPARED FOR <br /> ❑ ❑ ❑ 11. Fuel tests on flue[ transferred from old underground storage tank ( 0 (D)EWIRONMENTAL MANAGEMENT <br /> ❑ ❑ ❑ 12. Integrity Tank and Piping test results (TANKNOLOGY) <br /> N E] E] F113. Test results sent to A.Q.M.D. - (Fleet Sites) & Environmental Management, PACIFIC REGION <br /> 0 <br /> i ❑ ❑ ❑ 14. All test results given to SBC Environmental Management '' <br /> E PACIFIC BELL FACILITY <br /> e D. As-Built Documentation <br /> YES No N/A 124 W. ELM STREET <br /> n a ❑ ❑ ❑ 15. Contractor has submitted accurately marked set of as-built drawings LODI, CALIFORNIA <br /> to SBC Engineer. <br /> LODICA01 UE020 <br /> Ne <br /> %O <br /> SHEET TIRE: <br /> " 0 STAND-BY GENERATOR SUCTION SYSTEM <br /> Y� PROJECT CLOSE-OUT CHECK SHEET <br /> V ESTIMATE/ ROUTINE ORDER: DATE 2/26/01 SCALE AS NOTED <br /> a DRAWN BY: SEW CHECKED W. MED <br /> i <br /> ARCBITSCIIM • HNGA�tII'iG ' HN ONI�91 SRRVICRR SBC Au HomAnaN: SNEET: 6 OF.- 8 SHEETS SHEE No. <br /> 1137 N. McDOWELL BLVD. PETALUMA, CA 94954 (707) 765-1660 SVC DRAWING NO.: <br /> am9e DTC JOHN A JOHNSON, ARCHITECT JAMES H. RAY, CINL ENGINEER P8 <br /> J <br />