Laserfiche WebLink
/43 ID COLLARS T. <br /> c� <br /> 9 9 OFFSET CONSTRUCTION <br /> CIRCUMFERENTIAL SEAMS <br /> n <br /> PLAN VIEW <br /> D II <br /> L� v <br /> DOUBLE BUTT CONSTRUCTION <br /> A B E F J A LOGITUDIAL SEAMS <br /> C G <br /> STEEL <br /> GLASSTEEL'M SECONDARY <br /> 36 �� � �� �� 36 FIBERGLASS <br /> _ I - _ _ _ � COMPOSITE TANK <br /> — — — — — — — — — — — — — — — — — — — — <br /> ANNULAR <br /> \ I SPACE <br /> MODERN WELDING <br /> COMPANY � \ <br /> PRIMARY TANK <br /> OF/ NIA <br /> STRAPWN ENVIRONMENTAL TANK 16 <br /> / LOCATIONS CONSTRUCTION DETAILS <br /> INTERIOR: CLEAN OF DEBRIS, UNPAINTED <br /> modern I I EXTERIOR: F.R.P. COMPOSITE <br /> T E S T I N G <br /> \ DOUBLE THIS TANK ARRIVES AT THE JOBSITE UNDER VACUUM <br /> WALL AND DOES NOT REQUIRE FURTHER INTEGRITY TESTS. <br /> IF JOBSITE PRESSURE TEST REQUIRED, AIR TEST AT <br /> Th1 STRIKER PLATE NOT MORE THAN 5 P.S.I. PRIMARY, (INNER) TANK TO <br /> GLASTEEL I �/ TYPICAL UNDER BE TESTED ALONE. SECONDARY TANK TO BE TESTED <br /> / ALL OPENINGS WITH PRESSURE IN PRIMARY TANK. AT NO TIME SHALL <br /> \ – — — — __ — — — — — — — — — — — — — — — — — — — — THE PRESSURE IN SECONDARY TANK EXCEED THE <br /> PRESSURE IN THE PRIMARY TANK. HOLIDAY TEST <br /> F.R.P. COMPOSITE AT 35,000 VOLTS AT FACTORY. <br /> END VIEW SIDE VIEW <br /> FIBERGLASS-COATED DOUBLE WALL STEEL UNDERGROUND STORAGE TANK SYSTEM INSTALLATION <br /> FIBERGLASS COATED DOUBLE WALL STEEL TANKS. "MODERN WELDING–ENVIRO 16" <br /> SHOWN–ALTERNATE EQUAL MANUFACTURERS TO BE FABRICATED TYPICAL & APPROVED BY <br /> SBC ENVIRONMENTAL MANAGEMENT. SEE SITE SPECIFIC PLAN FOR CAPACITY AND <br /> QUANTITY OF TANKS. <br /> D AHq,,T�, _ <br /> UNDERGROUND FUEL STORAGE TANK mac ; YS <br /> UNLESS OTHERWISE SPECIFIED, TANKS SHALL BE INSTALLED FOUR (4) FEET BELOW FINISHED YARD GRADE. '` v`•. <br /> y TANKS SHALL BE SET ON A FIRM BASE OF 12" THICK CLEAN, WASHED, COMPACTED SAND AND #C 1 291 <br /> SURROUNDED ON ALL SIDES BY A MINIMUM THICKNESS OF 12" OF CLEAN, WASHED SAND. WET AND ROD SEP 7 2001 <br /> SAND UNTIL IT IS THOROUGHLY COMPACTED. AFTER PIPING HAS BEEN INSTALLED, INSPECTED AND TESTED, sr • .,e^1o,q : a�Q <br /> E COMPLETE THE BACKFILLING WITH SAND. BACKFILL WILL BE PLACED IN SIX (6) INCH LAYERS. EACH LAYER FOFggLCc�Q",, <br /> w SHALL BE PUDDLED AND TAMPED TO PREVENT FUTURE SETTLEMENT. THE NEED FOR PROPER BACKFILL AND l <br /> a COMPACTION IS COMPOUNDED WITH A DOUBLE WALL TANK AND ALL CONCERNED ARE FOREWARNED OF THIS <br /> REQUIREMENT. ALL COMPACTION TO BE 90%. REVISIONS AUTHORIZATIONS <br /> s <br /> o SY <br /> AFTER TANKS ARE DELIVERED TO SITE, TANK MANUFACTURER OR SUPPLIER IS RESPONSIBLE FOR oTANK SHALL MEET THE REQUIRMENTS OF NFPA 30 & 31. o. B SOBS / reoei DHs Dare <br /> 6 PERFORMING THE 35,000 VOLT HOLIDAY TEST AND REPAIR ANY HOLIDAYS DISCOVERED, THESE TESTS SUBMITTED FOR PERMIT 7/n/oi MED <br /> MUST BE WITNESSED BY ENVIRONMENTAL MANAGEMENT AND LOCAL REGULATORY AGENCIES. 13TANK SHALL MEET THE REQUIRMENTS OF UFC. <br /> E13TANK SHALL MEET THE REQUIREMENTS OF SCAQMD 1 CHANCE UNDERGROUND PIPING SPECIFIGAIGN 8/29/01 MED <br /> NO PRESSURE TEST IS REQUIRED BY THE CONTRACTOR IF THE TANK IS DELIVERED TO THE JOB SITE WITH METHANOL COMPATIBILITY RULE 1170. <br /> a VACUUM TEST, APPLIED BY THE TANK MANUFACTURER, IN PROGRESS. ED TANK SMALL BE BUILT TO THE SPECIFICATIONS OF7ACT 100, STEEL TANK INSTITUTE SPECIFICATION F <br /> o; REQUIRED INTEGRITY TANK (NON–VOLUMETRIC) VACUUM METHOD TO BE PERFORMED BY <br /> FABRICATION OF FRP/CLAD UNDERGROUND TANKSOR THE PROPRIETARY SBC INFORMATION <br /> F TANKNOLOGY CORPORATION. TANK TEST RESULTS TO BE SENT TO SBC ENVIRONMENTALNOT FOR GENERAL USE OR DISCLOSURE OUTSIDE OF SBC <br /> MANAGEMENT. O TANK SIHALL BEAR THE U.L. 1746 LISTING MARK FOR ENVIRONMENTAL MANAGEMENT UNDER EXEMPTIONS SET FORTH IN <br /> SECONDARY CONTAINMENT COMPOSITE UNDERGROUND TANK THE CALIFORNIA PUBLIC RECORDS ACT. THIS INFORMATION MAY <br /> " FOR FLAMMABLE LIQUID STORAGE AND THE ACT 100 LABEL ONLY BE USED BY AUTHORIZED PERSONNEL OF THE LOCAL <br /> GOVERNMENT AGENCY IN CONNECTION WITH APPLICATION FOR <br /> FOR CORROSION PROTECTION OF UNDERGROUND STORAGE PER ITS AND AUTHORIZATIONS FOR BUILDINGS, CONSTRUCTION, <br /> E TANKS. AND OR ZONING CHANGES. <br /> 'o <br /> DRAWINGS PREPARED FOR <br /> ( ENVIRONMENTAL MANAGEMENT <br /> N J 14" FNPT MONITOR <br /> SIZE DIAMETER LENGTH WEIGHT STRAPS H 4" FNPT MONITOR PACIFIC REGION <br /> E E 1,500 65" 9'-6" 4,400# 2 G 1 4" FNPT MONITOR EavoJEcrTn1E: <br /> 2,000 65" 12'-6' 5,200# 2 F 1 4" FNPT MONITOR PACIFIC BELL FACILITY <br /> a,x 3,000 65" 18'-6" 6,100# 2 E 1 4•' FNPT MONITOR 124 W. ELM STREET <br /> oa 4,000 85" 14'-6" 7,300# 2 D 1 1 1 4" FNPT MONITOR <br /> 5,000 97" 14'-1" 10,000# 2 LODI, CALIFORNIA <br /> N p <br /> 6,000 97" 16'-6" 11,675# 2 C 1 4" FNPT MONITOR LODICA01 UE020 <br /> &0 8,000 97" 22'-0" 14,050# 2 B 1 4" FNPT MONITOR SHEET TIRE <br /> a 10,000 97" 27'-6" 16,550# 3 A 1 2 1/2' FNPT MONITOR STAND—BY GENERATOR SUCTION SYSTEM <br /> Fz 12,000 97" 32'-6" 19,175# 4 MARK REQ'D SIZE TYPE RATING REMARKS TANK ORIENTATION/FITTING LAYOUT <br /> M <br /> 15,000 115" 29'-0" 25,500# 5 ESTIMATE/ ROUTINE ORDER: DATE 5/25/01 SCk AS NOTED <br /> & a 20,000 115" 38'-6" 31,750# 6 SCHEDULE OF OPENINGS DRAWN BY: SBW CHECKED BY. MED <br /> id <br /> a 9 NOTE: OTHER TANK DIAMETERS ARE AVAILABLE, ��jj SBC AUTHORIZATION: SHEET: 6 OR 6 SHEETS SHEET NO. <br /> CONTACT MODERN WELDING AT (559) 275-9353 MRIHi 1131 N. � BLVD. CA 949 o) T� SBC DRAWING NO.: <br /> �1110* ON" LEC JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CIML ENGINEER — P6 <br />