My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
7717
>
2300 - Underground Storage Tank Program
>
PR0231870
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 10:41:46 AM
Creation date
11/4/2018 4:55:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231870
PE
2361
FACILITY_ID
FA0003953
FACILITY_NAME
AT&T California - UE148
STREET_NUMBER
7717
STREET_NAME
ELM
STREET_TYPE
St
City
French Camp
Zip
95231
CURRENT_STATUS
02
SITE_LOCATION
7717 Elm St
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELM\7717\PR0231870\BILLING 1986-2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/06/01 0 <br /> r <br /> Turbine / Piping Sumps: <br /> 1. Remove sensor from program and remove sensor. <br /> 2. Monitor Sump for hazardous conditions, 02 or LEL. Maintain below LEL <br /> 3. Inspect for open, broken or defective electrical fittings and repair <br /> 4. Clean solid waste from sump and place in 5 gallon labeled waste pail <br /> 5. Add water to a level 2" above piping penetrations <br /> 6. Measure depth of water in sump and adjust telescoping tube on testing <br /> probe to center probe rod at water level <br /> 7. Install testing probe and avoid getting float wet above waterline. Clamp <br /> probe to support stand <br /> 8. Zero digital meter once level stabilizes <br /> 9. Sump fails if level change on 24 minute test is greater then .004 inches <br /> 10. If the change of level during the test is 1/4" or less, allow the fluid <br /> temperature to stabilize for 1 hour and retest <br /> 11. Locate leaks, repair and retest if possible <br /> 12.Pump out water and retain as testing fluid <br /> 13.Vacuum dry and confirm sensor operation <br /> 14.Reinstall sensor and re-program monitor <br /> 15. Repeat for each turbine sump <br /> Product Line Secondary. <br /> 1. Identify product line secondary containment manufacturer <br /> 2. Connect test boot to the secondary penetration in the piping/turbine sump <br /> 3. Connect test equipment to the secondary test fitting <br /> 4. Pressure the system to 1 psig and check all fittings for leaks <br /> 5. Continue pressurizing and follow manufacturers testing procedures <br /> 6. Repeat for all other line secondary containment <br /> Tank Annular Space. <br /> 1 . Identify the tank manufacturer <br /> 2. Remove or isolate the annular space sensor so it will not be damaged <br /> 3. Follow all of the tank manufacturers test procedures. <br /> Test Equipment: <br /> 1. Level Probe — Temposonics LH series probe (see attached sheet for <br /> details) <br /> 2. Meter for Probe — Temposonics TDU — 100 meter <br /> 3. Digital Pressure Gage for Line secondary testing <br /> 4. Dial Vacuum Gage for Tank Annular Space testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.