Laserfiche WebLink
Site Address: 7717 S. MCKINLEY, STOCKTON A Date of Testing/Servicing: <br />Monitoring System Certification <br />UST Monitoring Site Plan <br />Date map was drawn:_�1_/_L4_/C_. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br />was prepared. <br />Page —of _ 05/00 <br />