Laserfiche WebLink
S. a. Describe the method that will be utilized to purge and/or inert the tauk(s} <br /> UIX <br /> b. TaeklPiping Hauler. <br /> Name F"&i 1 r� <br /> Address ;SSS yarf leo �le"QJ ziPqjg6 <br /> Phone No4 41 S ) `'2K——l 39 3 <br /> Hauler Registration M(if hauled as hazardous) 3 7 �— <br /> c. Tank/Piping Disposal Site: <br /> Name ) ���q <br /> Address ��� i)acc L ' euru�fl City ZIP��_ <br /> Phone Nol+-15)2-��;-1393 <br /> EPA IDN(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an Independent third party from the contractor? YESA NO(] <br /> 9a. Describe,in detalL how the soil and/or wter sample(s)beneath the tank and plpping will be obtained <br /> ;l Sunnlrfs� '�o n nra�h ro nen T <br /> 1 In tor, 1b...be, In',jeclar <br /> 10. Describe how the excavationwillbe backfflle(d with suitable materialL• <br /> rupon remova <br /> (-EDCS%� f,a��) tXi[ln'tl l�r[� f �Ilh `Deacfaue ( <br /> k( eoc <br /> 11. Handling of excavated soil:' <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> 14 <br /> b)What will be the final destination of the excavated stockpile? <br /> 00/1 P <br /> c)Contaminated Soft Hazardous Waste Hauler. CV tl f essu y) <br /> Namer\ p f Hauler Registratlon8 [37LlaZ <br /> Address �S� ?at f po (f lar e'/` City o j <br /> PhoneNo.( X115 1 �Z"l—iZy3 <br /> ER 23 046(Revised 10119198) Page 5 <br />