Laserfiche WebLink
- <br /> on or Dealer Address Ciry San Deta of Test <br /> 5:1-0 15. TANK TO TEST 16. CAPACITY Form <br /> x ^;F By most accurate rn❑ Station Chart <br /> eat Nominal Capacity �� _ capacity chart available , gl Tank Manufacturer's Chan <br /> rn O new r women/ Galbro Canons ❑ Company Engineering Data <br /> A� Is there doubt as to True Capacity? ❑ ❑ <br /> ChxsssupdMd with <br /> I� Grads Sae Section"DETERMINING TANK CAPACITY" ❑ OMw <br /> 17. FILL-UP FOR TEST Stick Roodkob Total Gallom <br /> to K kr, asob es.Reading <br /> Stick Water Bottom <br /> before Fi14up Inventory <br /> S 5 7 <br /> to Kin. GWOrnt � /r <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter (�� Product in full tank(up to fill pipe) <br /> 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK // VAPOR RECOVERY SYSTEM <br /> Sae manual sections applicable.Check below and record procedure in log(RI.Water Observation-Well Ie,,ol Stage I <br /> Nrot�_ <br /> m a_-3 E] wow In tank ❑ High water table in lank excavation ❑ Lim(a)being tested with LVLLT .� Stage H <br /> 2 1 <br /> Mo. 2 <br /> W m m°v 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK <br /> N F v 19. TANK MEASUREMENTS FOR Z} � e- <br /> N ca m °F Connected API Grarl v <br /> o TSTT ASSEMBLY Otxp rad AR Gnd T <br /> , _ <br /> a_ Bottom of tank to Grade'.................... 22. Tharm d-Senwr rssdaq after circulallon 7,3 6 'S °F <br /> nAdd 3M for 4"L ................. dipn <br /> Add 24"for 3"L pr air sett....... 23. Cigna per°F in range of expected change <br /> Total tubing to assemble Approximate , .3,;z " <br /> T4. gallons <br /> 20. EXTENSION HOSE SETTING total awntny in coefficient of expensim for volume change in this talk <br /> Tank top to grace'....-.................. ......... full tank(16 or 17) involved product per°F <br /> Extend hoes on suction tube G"or mon 2 I /1 <br /> below J2 tanktop ..................................... ,. 25. y����O�/`U + / v / f��/0 /709/" <br /> This ie <br /> volume change per°F(24) Digits per°F in teat Volufne change per dgiL test <br /> *If Fill pipe extends above grade,use top of rill. Range(23) Compute to 4 decimal places. factor(e) <br /> 26. 30. HYDROSTATIC 31. 34. 38.NET VOLUME 39. <br /> LOB OF TEST PROCEDURES PRESSURE VIRGIN YELSUAEI1 GAL IR 1FYHAAE FA TONPEISAEIOA CHANGES ACCUMULATED <br /> CONTROL RECORD 10.OIL GAL USE FACTOR tai EACH READING CHANGE <br /> V27. 28. 29. SMa h"Lml 32. 35. 36. 37. limwnnn M NM tans rxerr Reea4 dalaile sf settin U ie Id,a Product m Product Cheap Compatnies Adjustment ban Ea[known <br /> A p Asaeel Gndia n Restored(-) Thermal H*m f TO (a). Volume Minusand fanning test.(Use full Yo. B"xV iaA Leval to Sane. Lax— Expnues♦ M w lml Hoard, <br /> length of line if needed.) of mhid Baler, Aller pro"a ReadinA ECormadn n I ) Okx,ser NMr(c) Cama<tion- Comnmon I-1Reading Banner Radial ilaa/iae Recawre11a1 ♦30IV)-aO71T1 IarPs crnxul <br /> I c v <br />