My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
COMPLIANCE INFO PRE 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 2:19:52 PM
Creation date
11/4/2018 5:01:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2016
RECORD_ID
PR0231487
PE
2351
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
01
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ESCALON\1329\PR0231487\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
1/4/2017 5:47:14 PM
QuestysRecordID
93419
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name 7-l-,,7i-,, r U�t/-T4 MoD aL FUS L <br /> Facility Address -r,4 �J /A 'J-92o <br /> A. Describe the frequency of performing the monitoring: <br /> Tank 6blegY 75 AY <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring. <br /> Tank .57/ct <br /> Piping <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> 6FS'CAC0'1 AVE f SC�4� ✓ !� qs 3 ?0 <br /> Sec '4 sAC�C-gl AIAP <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> (y P2 <br /> %7AVl D Cot rt t D v C_A41,eG,1rR � <br /> E. Reporting format for monitoring: <br /> Tank At- fAm j A 4- — <br /> Pipino <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: nnMEFJ;Z� ChMGF Tam <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: Ate 7"F= <,a c,r X M E r 1(^,a <br /> KaJOUS IV*'9 T Tiir y ka✓c '�;O Do in/ 7HE e.o-sC me <br /> 1,�,Mr4Lc641cH <br />
The URL can be used to link to this page
Your browser does not support the video tag.