Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue , Stockton , California 95205-6232 <br /> Telephone: (209 ) 468 -3420 Fax : (209 ) 468 -3433 Web: www. sjgov . org/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name : Facility Phone: Date : <br /> ARCO 83812 (209 ) 838-7579 February 15 , 2018 <br /> Facility Address : CERS ID: <br /> 1329 S ESCALON AVE , ESCALON , CA 95320 10746523 <br /> Inspection Contact: Title: Phone: <br /> Rahul Dhanda Manager (209 ) 838-7579 <br /> Inspection Type: Program : <br /> ROUTINE INSPECTION - Operating Permit 2351 - UST FACILITY - 2481 COMPLIANT <br /> Consent For : I Consent Given By : <br /> Z Inspection 0 Photos ❑ Samples Rahul Dhanda , Manager <br /> Service Technician Onsite: Exp. Date : Designated Operator: Exp. Date : <br /> Byron Molina 05/ 18/2018 Guadalupe Sanchez 01 /28/2019 <br /> Service Technician Manufacturer's Training <br /> Veeder Root , 03/09/ 19 <br /> CCR = California Codeo egu ations HSC = Health and Safety Code CFR = Codeo a era Regulations <br /> V = Violation R = Repeat violation COS = Corrected on site during inspection <br /> File Review <br /> 101 HSC 25284 Failure to obtain a valid permit to operate from the EHD including but not limited to unpaid fees ❑ V ❑ R ❑ COS <br /> 102 HSC 25284(a) (3) (A)/(B) No written agreement between tank owner and tank operator to monitor the tank system ❑ V ❑ R ❑ COS <br /> 103 HSC 25292 . 21 25299 . 30 Current financial responsibility documents not submitted ❑ V ❑ R ❑ COS <br /> 104 CCR 2711 UST operating permit application for facility and tank information not submitted or current ❑ V ❑ R o COS <br /> 105 CCR 2632 (d) ( 1 ) , Failed to have an approved UST monitoring plan ❑ V ❑ R ❑ COS <br /> 2634(d) <br /> 106 CCR 2632 (d) (2) , Failed to have an approved UST response plan ❑ V ❑ R ❑ COS <br /> 2634(e) <br /> 107 CCR 2632 (d ) ( 1 ) (C) Plot plan/site map not submitted or failed to completely show where monitoring is performed o V ❑ R ❑ COS <br /> 108 CCR 2637 (f) , 2638(e) Failed to notify the EHD 48 hours prior to conducting testing o V n R ❑ COS <br /> 109 CCR 2637 Failed to test secondary containment ❑ V ❑ R ❑ COS <br /> 110 CCR 2637(e) Failed to submit secondary containment test report within 30 days n V ❑ R ❑ COS <br /> 111 CCR 2638(a) Failed to test monitoring and leak detection equipment annually n V ❑ R ❑ COS <br /> 112 HSC 25284 . 2 Failed to test spill containers annually ❑ V ❑ R ❑ COS <br /> 113 CCR 2638(d) Failed to submit monitoring system certification test report within 30 days ❑ V ❑ R ❑ COS <br /> 114 CCR 2636 (f) Failed to perform 0 . 1 gph annual line test for pressurized piping without fail safe or shut down ❑ V ❑ R ❑ COS <br /> 115 CCR 2715 (a) Failed to submit to EHD notification of designated operator identification or change w/in 30 days ❑ V ❑ R ❑ COS <br /> 116 CCR 2715 Designated operator, service tech or installer did not possess current ICC certification ❑ V ❑ R ❑ COS <br /> j117 CCR 2663 (h) Failed to inspect a lined or repaired steel tank within 10 years of lining and every 5 years after ❑ V ❑ R ❑ COS <br /> 118 CCR 2663 Failed to submit tank lining certification within 30 days or to conduct proper tests o V ❑ R ❑ COS <br /> 119 HSC 25299(a) (8) , Documents were falsified or misrepresented ❑ V o R ❑ COS <br /> 25299 (b) (7) <br /> 120 CCR 2635 (d) Failed to submit UST Certification of Installation/Modification ❑ V ❑ R ❑ COS <br /> 121 CCR 2712 (f) Failed to submit a written response within 30 days of receiving an inspection report ❑ V ❑ R n COS <br /> 122 CCR 2631 Q) Failure to submit and maintain UST system component statement of compatibility for substance stored ❑ V ❑ R ❑ COS <br /> On Site Records <br /> 201 CCR 2712 (b) Failure to maintain monitoring , maintenance , and follow up action records ❑ V ❑ R ❑ COS <br /> 202 CCR 2712(b) Failed to maintain cathodic protection test records on site for at least 6 1 /2 years ❑ V ❑ R ❑ COS <br /> FA0000293 PR0231487 SCO01 02/15/2018 <br /> EHD 23-01 Rev. 09/22/16 Page 1 of 4 Underground Storage Tank Program OIR <br />