My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1360
>
2300 - Underground Storage Tank Program
>
PR0231486
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 11:09:28 AM
Creation date
11/4/2018 5:09:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231486
PE
2381
FACILITY_ID
FA0009157
FACILITY_NAME
McDowell & Davis Towing & Auto Repair
STREET_NUMBER
1360
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22706108
CURRENT_STATUS
02
SITE_LOCATION
1360 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ESCALON\1360\PR0231486\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
4/4/2013 8:00:00 AM
QuestysRecordID
93891
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> STATE OF CALIFORNIA W <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION • FORM B W m� <br /> . , o <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. P cA`��`"��� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED / <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: I �5 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.• ILI B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAY/YEAR) 1011605 <br /> D. TANK CAPACITY IN GALLONS: O <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> REGULAR <br /> A O 1 MOTOR VEHICLE FUEL OIL B. C. E] taUNLEADED <br /> 3 DIESEL ❑ 6 AVIATIONGAS <br /> O 2 PETROLEUM ❑ 80 EMPTY ❑ 1 PRODUCT E] 1EPREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> � UNLEADED ❑ 5 JETFUEL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN [t """ E ❑ 2 LEADED �OTHER (DESCRIBE IN ITEM D.BELOW) <br /> D. IF(AA)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED /,✓ r C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES AB,AND C.AND ALL THAT APPLIES IN 13OXD <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEOTANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ /0 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED �UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS UNING MATERIAL COMPATIBLE WITH 107%METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION O 91 NONE �tlNf�IOWN ❑ 9B OTHER <br /> IV.PIPING INFORMATION CIRCLE A IFABOVE GROUND OR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U / SUCTION A U 2 PRESSURE A(C3)GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U i BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION p UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION E:71 1 AUTOMATIC LINE LEAK DETECTOR ALINE TIGHTNESS TESTING ❑ 31NTE STITIAL99 OTHER <br /> MONITORING <br /> V.TANK LEAK DETECTION <br /> FI <br /> VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> TANK TESTING ❑ 7 INTERSTITIALMONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERTMATERIAL7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICAN75 NAME DATE <br /> (PRINTED a SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# r, TANK# /NL ✓/3 <br /> STATE I.D.# 3 <br /> PERMITNUMBER �/ PERMIT APPROVED BY/DATE PERMREXPIRATION DATE (� <br /> FORM B (9.90) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. ' <br /> w FOB0031&R/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.