My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1360
>
2300 - Underground Storage Tank Program
>
PR0231486
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 11:09:28 AM
Creation date
11/4/2018 5:09:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231486
PE
2381
FACILITY_ID
FA0009157
FACILITY_NAME
McDowell & Davis Towing & Auto Repair
STREET_NUMBER
1360
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22706108
CURRENT_STATUS
02
SITE_LOCATION
1360 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ESCALON\1360\PR0231486\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
4/4/2013 8:00:00 AM
QuestysRecordID
93891
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA J a <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY+TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBAOR FACILITY NAME WHERE TANK IS INSTALLED: 36,eq <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# L B. MANUFACTURED BY: /k- <br /> C. DATE INSTALLED(MO/DAY/YEAR) ds D. TANK CAPACITY IN GALLONS: 5ve? <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE REM C. <br /> A. ❑ 1 MOTOR VEHICLE FUEL 4 OIL 8. C. ❑ IAUNELFADUED 3 DIESEL ❑ g AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY ❑ 1 PRODUCT ❑ lb PREMIUM 4 GpSAH01 ❑ 7 METHANOL <br /> UNLEADED ❑ 5 JET FUEL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN WASTE 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D.BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORSO C.AS.0 <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOX <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK1 BARE STEEL F72 STAINLESS STEEL F-] 3 FIBERGLASS ❑ 4 STEEL CLAD W1 FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> F-11 RUBBER LINED ❑ 2 ALKYD LINING F-13 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR <br /> LINING F-] 5 GLASS LINING ❑ 6 UNLINED g-g6-Uµ(NOWN ❑ 9B OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? VES_ NO— <br /> D.CORROSION ❑ i POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE UNKNOWN ❑ 99 OTHER <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IFUNDERGROIF APPLICABLE <br /> UND BOTH <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE GRAVITY A U W OTHER <br /> B. CONSTRUCTION A SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL WI COATING A U 8 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODICPROTECTION p UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETEC"IR ❑ 2 LINE TIGHTNESS TESTING ❑ 91NIMONERSTI IAL 99 OTHER <br /> RORING ❑ <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING UTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING —7INTERSTITIAL MONITORING ❑ 91 NONE 95 UNKNOWN ❑ W OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MOIDAYIYR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MpTERIAL7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 6 StGNATI)REI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# M © 6 <br /> PERMITNUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE Z <br /> FORM B (&90) THIS FORM MUST BE ACCOMPANIED BY A PERMrF APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FORM&M <br />
The URL can be used to link to this page
Your browser does not support the video tag.