Laserfiche WebLink
UM p <br /> STATEOFCAUFORIA �pcb `i <br /> STATE WATER RESOURCES CONTROL BOARD {� - <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION• FORM B �� :e <br /> gid; . <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. �""°""�� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOS <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED ©/ <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: I S S S p <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# S. MANUFACTURED BY: <br /> C. DATE INSTALLEO(MOtDAY/YEAR) C� 7 S D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS ISMARKED,COMPLETEITUW— <br /> X <br /> A ❑ 1 MOTOR VEHICLE FUEL 4 OIL B. C. ❑ 1aUN <br /> UNLEADED 3 DIESEL ❑ 6 AVIATIONGAS <br /> 2 PETROLEUM ❑ m EMPTY 1 PRODUCT EE::] 1DREGULAR UN EAIDUM ED ❑ 5 JETFUEL 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN WASTE E::] 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.I)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED eL-S/-r- C.A.S.6: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DO LE WALL 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 GLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) E::] 99 OTHER <br /> B. TANK ffl,1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimuyTmk) ❑ 9 BRONZE ❑ 10 GALVAN17ED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 kjlZ LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIIOR F-15 GLASS LINING 'BUNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINIS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES_ NO_ <br /> D.CORROSK)N ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION Fa 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IFUNDERGROUNk%H IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2PRESSURE U I 3 GRAVITY A U OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH 9 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 S LW/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECT!ONK V,95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR LINE TIGHTNESS TESTING ❑ MONRORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 V CHECK2 INVENTORY RECONCILIATION E] 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING E] 5 GROUND WATER MONITORING <br /> e TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBS <br /> UB STANCE REMAINING GALLONS INERTMATERIAL? YES ❑ NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 8 SIGNATURE] <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# ,pEtZIc15 <br /> STATE I.D.# ' pcl I I I I I S 6 I I IS 1 61611c? 3 <br /> PERMIT NUMBER PMIT APPROVED BY/DATE <br /> ERPERMIT EXPIRATION DATE/G <br /> FORM 8 (7.91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED../� /G <br />