My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
INSTALL_1999 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:41 AM
Creation date
11/4/2018 5:22:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999 TANK TOP UPGRADE
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SHELL) 68150 (WRR 6133)
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\13975\PR0231622\TANK TOP UPGRADE 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QST SYSTEM DRAWING INFORMATION <br />Three cpnplere sets of plans (fncicCe ,mrrafacturer-s specification sheets for proposed W ipnent to be intstatled). <br />Plans drnun 'a scale in names ilble prirt- <br />S. Plot plan to snout location of t4rd2 and all aasoci step piping- <br />.. Striker places or drop tube-mnxahzed bort® protectors illusrrared below ail accessibLe openings- <br />i. rank cross-sectional diagram- <br />s. petal( of zank, assocnatad piping, excavation and cover. <br />7. Tank(s) and piping approved by a nacion>ally recogni Led indepwKienr testing organi zar. on- (Title 23, Chapter 16, <br />Article 3, Section 2631 (b) J. 26351 <br />3. verification of product coaparihi(fty with the ra kts). piping, ,ioniroring <br />device(s), epoxy or silicone glues, etc- <br />i. Manufacturer's vrizzen instellacion im%t (Ons for zank(a), piping, monitoring devices, aCc- <br />10. — At the installation size, pNor to installation, a rightness tat shalt be performed on both Priasry (Ie) art! <br />secondacy (2') contaiment systess before cowering. (Section 2655 (a) (3) i (c)) <br />Tank integrity test required upon coaplerion of insrallarion with rank in operating common. Test results to be <br />suolnitted directly to PNS-uc free the [sting Canipar.y ar owner of facility- Caeatth L Safety Code, Division 2a, <br />Chapter 6.7, Saacion 25291 (h)) <br />12 Tarr C:mmoslTTnr <br />I <br />TANK 3 Y! <br />s qf1 <br />S <br />j CAPACITY 6)(I ST(N6 <br />TANKS <br />I REMAIN <br />NANUf ACTURER <br />I <br />CCMPOS:TION <br />y <br />w00EL I <br />PRODUCT �GASOLin/(: <br />(5ASouN6I <br />GASou"e <br />CORROSION ?ROTECT:ON <br />J.L. L:$ ---,D <br />CCMPAT131LITY WITM 100% <br />wETNaroL <br />:3. TANK(s) To aE INVA).iF �Xl5TiNG TANKS P6MAiN <br />A. Steet-clad with fiberglass reinforced plastic coatings, coapesices, or CqufvatenT MOn-eetoWC exterior <br />coatings or coverings. <br />�. (1) Tested at the installation site Wring an electric resis2anCe holiday detector. <br />(2) Vacuo applied to interstirial SoaCe- <br />9- fioerglass <br />_- (1) insrai(atfon irstrt ,ICM rewire an air test and soap bubble test prior to installation. <br />(2) Vacua applied to fnrerstitfal spoca. <br />(3) aydrostatie annular (primary tank pressure test). <br />C. von -Clad steel rank (Septfon 2635 (a) (2) (All <br /><') Cathodic protection Provided for entire rani[, piping and cap,, nents (mu, botrS, mashers, <br />etc -)- <br />CZ) Field ira:a(led cathodic protaetion systmns designed and Certified as ade"te W a <br />CCrrosiM scec,atist. <br />(3) :dpressed Current systems to oe impeored no less :hen very 60 da, <br />
The URL can be used to link to this page
Your browser does not support the video tag.