Laserfiche WebLink
'• D. Results of TestingfServicing <br /> Software version Iststalted: - <br /> Com tete the Fon2win checklist: <br /> l"Yes ❑ No* is tlrc audible alarm ional? <br /> 17 Yes a No* Is the visual aha o -oast? <br /> Z-Yes O Now. were all sensors-muall inspected,functionaH tested.and coafumed a tational2 <br /> .Yes ❑ Nu* Were all sensors installed at lowest point of secondary containment and positioned so that other equipmeot mill <br /> not interFere vittL thea ro r o ratim? <br /> ,,Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> Q NIA operational? <br /> Yes Q No Ftu pressurized pipigg systems,does the turbine automatically shut down if the piping secondary containment <br /> Q N/A montioung system detects a leak,fails to operate,or is electrically disconowtod? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply)-USumpRYanch Seasons: QD's ns Contsinment Sensors. <br /> Did you confirm positive shutdown due to leaks Mg sensor fatlure/disco a. es; ❑No. <br /> Ta--.Yes Q No* For tank systems that u4lize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑ NIA mechanical overfill prevention valve is installed),is the overfill waming alarm visible and audible ffie tank <br /> fill point(a)and o 1 ? If so,at what percent of tank capacity does the alarm trier? `---' % <br /> Q Yes+ No Was any monitoring equipment replaced' >t yes,identify specific sensors,probes,ar other equipment replaccd <br /> and list the manufacturer name and model for all Iaceamt in Section below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that aPPIY)Q <br /> produce; Mwwa , Sf -s,desuiUecwses in Section E,below, <br /> ❑ No* I Was monitoring system s -up reviewed to ensure proper settings?Attach set up re oris,if a licable <br /> Yes Q No* I Is all monitorin ui mento atiooal PetioaDuiscrures ifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E Comments: --- <br /> Page 2 of 3 03/01 <br />