Laserfiche WebLink
F. In-Tank Gauging I SIR Equipment: MB ,Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the fo _ ing checklist: <br /> O Yes Q No" Has all input wiring been inspected for proper entry and termi ation,including testing for ground faults? <br /> L) Yes O No* We all tank gouging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes Q No* Was accuracy of system water level readings tested? <br /> 0 Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes O No* 'Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors ULD): ❑ Check this box if LLDs am not installed.- <br /> Com tete the following checklist: Pc C3 t4-,V,-s <br /> D Yes D NO For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> O NIA (Check all dtnt apply) Simulated leak rate: ❑3 g.p.h.; Ll 0.1 g.p.h; Q 0.2 g.p.h. <br /> ❑ Yes O No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> O Yes O No* Was the testing appamms properly calibrated? <br /> O Yes O No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> O NIA <br /> O Yes O No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> O NIA <br /> El Yes ❑ No* For electronic LLDs, docs the turbine automatically shut off if any portion of the monitoring system is disabled <br /> C2 NIA or disconnected? <br /> O Yes 0 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> Q NIA or fails a test? <br /> O Yes ❑ No- For electronic LLD$,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> q Yes Q No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be correctedL <br /> H. Comments: ol,e <br /> 04 a <br /> Page 3 of 3 oyor <br />