My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_1992 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:32 AM
Creation date
11/4/2018 5:25:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992 - 2006
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\14000\PR0231631\COMPLIANCE INFO 1992 - 2006 .PDF
QuestysFileName
COMPLIANCE INFO 1992 - 2006
QuestysRecordDate
3/16/2017 4:23:12 PM
QuestysRecordID
3355446
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging I SIR Equipment: MB ,Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the fo _ ing checklist: <br /> O Yes Q No" Has all input wiring been inspected for proper entry and termi ation,including testing for ground faults? <br /> L) Yes O No* We all tank gouging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes Q No* Was accuracy of system water level readings tested? <br /> 0 Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes O No* 'Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors ULD): ❑ Check this box if LLDs am not installed.- <br /> Com tete the following checklist: Pc C3 t4-,V,-s <br /> D Yes D NO For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> O NIA (Check all dtnt apply) Simulated leak rate: ❑3 g.p.h.; Ll 0.1 g.p.h; Q 0.2 g.p.h. <br /> ❑ Yes O No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> O Yes O No* Was the testing appamms properly calibrated? <br /> O Yes O No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> O NIA <br /> O Yes O No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> O NIA <br /> El Yes ❑ No* For electronic LLDs, docs the turbine automatically shut off if any portion of the monitoring system is disabled <br /> C2 NIA or disconnected? <br /> O Yes 0 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> Q NIA or fails a test? <br /> O Yes ❑ No- For electronic LLD$,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> q Yes Q No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be correctedL <br /> H. Comments: ol,e <br /> 04 a <br /> Page 3 of 3 oyor <br />
The URL can be used to link to this page
Your browser does not support the video tag.