My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_1992 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:32 AM
Creation date
11/4/2018 5:25:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992 - 2006
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\14000\PR0231631\COMPLIANCE INFO 1992 - 2006 .PDF
QuestysFileName
COMPLIANCE INFO 1992 - 2006
QuestysRecordDate
3/16/2017 4:23:12 PM
QuestysRecordID
3355446
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: U Piping Manufacturer U Industry Standard U Professional Engineer <br /> U Other(Specify) <br /> Test Method Used: U Pressure U Vacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass -Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron <br /> Piping Diameter: n ti n <br /> Length of Piping Run: i so I + I + <br /> Product Stored: Reg. Super Plus <br /> Method and location of UDC to UDC to UDC to <br /> piping-run isolation: P112e sumps t)ipe sumps pipe sumps <br /> Wait time between applying <br /> pressure/vacuum/water and t <br /> hr. z hr. hr. <br /> starting test: <br /> Test Start Time: 1000 1 0 <br /> Initial Reading(R,): 4 . 5 PSI 4. 5 PSI 4 . 5 PSI <br /> Test End Time: 1100 1100 1100 <br /> Final Reading(Rr): <br /> Test Duration: <br /> Change in Reading(R,R,): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: 0 Loss 0 Loss 0 Loss <br /> Test Result: IX Pass U Fall LBPass U Fail DC Pass U Fail I I Pass U Fail <br /> Comments— (include information on repairs made priorto teking, and recommended follow-tip forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.