Laserfiche WebLink
. ,, • • <br /> SWRCB,January 2002 Page 6 of 8 <br /> 7. UNDER-DISPENSER CONT ENT (UDQ TESTING <br /> Test Method Developed By: U UDC Manufacturer U Industry Standard U Professional Engineer <br /> U Other(Specify) <br /> Test Method Used: U Pressure U Vacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC# UDC# UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when U Yes UNo UNA <br /> UDC sensor detects either U Yes U No U NA UYes U No U NA U Yes U No U NA <br /> roduct or water?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- U Yes U No U NA U Yes UNo UNA U Yes UNo UNA U Yes UNo UNA <br /> safe shutdown?* <br /> Was fail-safe verified to be UYes UNo UNA Utes UNo UNA UYes UNo UNA UYes UNo UNA <br /> operational? <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: <br /> Initial Reading (R,): _ <br /> Test End Time: <br /> Final Reading(RE): <br /> Test Duration: <br /> Change in Reading R,R,): <br /> Pass/Fail Threshold orCriteria: <br /> Test Result: U Pass ALJNA <br /> U Pass U Fall U Pass U Fail U Pass U Fall <br /> Was sensor removed for testing? U Yes UNU Yes UNo UNA U Yes UNo UNA U Yes U No U NA <br /> Was sensor properly replaced and p Yes ❑NU Yes UNo UNA UYes UNo UNA U Yes U No U NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing and recommended follow-up forfailed tests) <br /> If the testing method does not test the entire depth of the UDC,specify how much of the UDC was tested. Methods not testing the <br /> entire UDC should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWRCB LO-160) <br /> 'With the submersible pump running,place the sensor in product(discriminating sensors should also be placed in water). The time <br /> between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br /> containment testing method used does not test the entire volume of the UDC <br /> This information is not needed if the entire UDC is tested. <br />