Laserfiche WebLink
SWRCB,January 2002 Page 8 of S <br /> 9. SPILLIOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes U <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested U <br /> Test Method Developed By: U Spill Bucket Manufacturer U Industry Standard U Professional Engineer <br /> U Other(Specify) <br /> Test Method Used: U Pressure U Vacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(R,): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: U Pass U Fail U Pass U Fail U Pass U Fail U Pass U Fail <br /> COMmerits—(include information on repairs made prior to testing,And recommended follow up forfailed tests) <br /> Please direct any comments regarding this form to: <br /> SWRCB UST Program,Attn: Scott Bacon <br /> 1001 "1"Street,Box 944212 <br /> Sacramento,CA 95814 <br /> Phone:(916)341-5873,Fax:(916)341-5808 <br /> e-mail:bacons@cwp.swrcb.ca.gov <br />