Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> °c Unit Supervisors <br /> 2` ? Donna K.Heran,R.E.H.S. <br /> 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Director Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> • cq.,,....n.. • Program Manager Telephone: (209)468-3420 Margaret Lagorio,R.E.H.S. <br /> t�c oa Laurie A.Cotu0a,R.E.H.S. Robert McClellon,R.E.H.S. <br /> Program Manager Fax: (209)464-0138 Mark Barcellos,R.E.H.S. <br /> January 21, 2003 <br /> Oil Equipment Services <br /> Attn: Keith Tallia <br /> P.O. Box 950 <br /> San Andreas, CA 95249 <br /> Re: Mini Mart <br /> 14000 E. Highway 88, Lodi CA <br /> The permit application to expose the product lines for the exploration of a leak has been <br /> approved with the following conditions: <br /> 1. A complete description of work performed must be submitted prior to scheduling <br /> the final inspection. <br /> 2. If any piping is to be repaired or replaced Environmental Health Department <br /> (EHD)must be notified so that an inspection can be arranged and parts can be <br /> approved prior to commencing work. Per Environmental Health assessment of <br /> findings, new plans and a permit application may be required to be submitted. <br /> 3. Soil sampling may be necessary per Environmental Health assessment. <br /> 4. A line integrity test on the primary piping of all exposed lines must be performed <br /> by a certified technician and results received by this office prior to the final <br /> inspection. <br /> 5. If concrete is broken near the underground storage tank a tank integrity test must <br /> be performed by a certified tank tester prior to the final inspection. <br /> 6. A 24-hour lake test will be required on any sumps that require repair/replacement. <br /> 7. EHD must witness a 30-minute pressure test on all repaired/replaced piping prior <br /> to backfill. <br /> 8. Arrange a final inspection with this office prior to returning this station into full <br /> service. Give 48 hour notice for all inspection appointments. <br /> 9. All requirements of the State Contractor License Board, including but not limited <br /> to subcontracting to anyone who is not a licensed contractor must be satisfied. <br /> If you have any questions,please call Dennis Catanyag,REHS at(209) 468-3459. <br /> Thank you <br /> nnis Cata S <br /> Registered Environmental Health Specialist <br />