My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_1992 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:32 AM
Creation date
11/4/2018 5:25:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992 - 2006
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\14000\PR0231631\COMPLIANCE INFO 1992 - 2006 .PDF
QuestysFileName
COMPLIANCE INFO 1992 - 2006
QuestysRecordDate
3/16/2017 4:23:12 PM
QuestysRecordID
3355446
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-18-2002 29: 16 •S 8 D TIME OIL CO SEATTLE P, 206 285 0639 P.02/03 <br /> WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before snaking <br /> the change.Required by CCR 2632 (d)and 2641 (h). <br /> FACII,ITY NAME Jackpot Food Mart DATE 717/02 <br /> FACILITY ADDRESS 14000 E. Hwy. 88, Lockeford, CA 95237 04-049 <br /> 1.Name(s) and Titles(s)of the people responsible for performing the monitoring and/or maintenance <br /> Contracted out--Testing-Tank Tek Phil Rooms <br /> Maintenance- Oil Equipment Services or Elite IV <br /> 2.Describe the frequency of performing the monitoring for <br /> TANKS Double Wall Tanks- Interstitial-Annually PIPING Annually <br /> Monthly print-outs <br /> 3.Describe the location(s)of where the monitoring will be performed, i.e. location of sensors <br /> At tank location and the TLS-350 <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel Veeder Root TLS-350 <br /> Name and Model of Line Leak Detectors Red Jacket <br /> Name and Model of Annular Sensors Veeder Root <br /> Name and Model of Piping Sensors Red Jacket Leak Detectors <br /> Name and Model of Dispenser Sensors N/A <br /> Type of overfill prevention 2-Point Vapor Recovery <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes Q No Turbine Sensor only <br /> Does the turbine shut down if a sensor is disconnected? Yes © No <br /> Does the turbine shut down if the monitoring panel loses power? Yes No x0 <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> On the TLS-350 <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 month. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br /> annual monitoring certification be performed int The Marketing Consultant runs a sensor program from <br /> the TLS-350 The annual testing is done in May. <br /> Now:for new installations the secondary containment mus[be tested 6 months after installation. All seeondaty containment systems <br /> must be tested once every 36 months with initial lesling performed before January 1,2003 <br /> S.Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> equipment. The franchisee is trained by the Marketing Consultant to do daily inspections and record them <br /> on a Monitoring Log. There is also a 2-3 week training course before they go into the store. <br />
The URL can be used to link to this page
Your browser does not support the video tag.