My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_1992 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:32 AM
Creation date
11/4/2018 5:25:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992 - 2006
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\14000\PR0231631\COMPLIANCE INFO 1992 - 2006 .PDF
QuestysFileName
COMPLIANCE INFO 1992 - 2006
QuestysRecordDate
3/16/2017 4:23:12 PM
QuestysRecordID
3355446
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' • Revidwed by David Rabb • • Praxair Service,Inc.QA <br /> Approved by Randy Golding Tracer Tight® <br /> Update 10-14-04 Version V-4 <br /> Leak Simulation <br /> Injecting a tracer into the backfill performs a leak simulation. The leak simulation tracer is not one of the tracers used in <br /> testing the system. The migration period of the leak simulation tracer is monitored through the sampling probes. The <br /> minimum migration time required for the test is equal to the time required for the leak simulation tracer to move an <br /> acceptable distance. The minimal acceptable distance is the longest distance that the test tracer would have to travel from <br /> any leak location to the location of a sampling probe. <br /> Sample Collection <br /> Once the leak simulation migration period is determined satisfactory the inoculation and waiting period is completed and <br /> sampling can begin. Vapor samples are collected from all sampling probes. Additional vapor samples may be collected <br /> from sumps containing UST components,UDC's and from the interstitial spaces of double walled components. <br /> Sample Analysis <br /> Samples are analyzed using an on site laboratory grade gas chromatograph (GC). The GC is calibrated using an external <br /> gas standard. Samples are analyzed by direct injection into the GC. The results are evaluated by comparison to the <br /> analytical standard. Whenever tracer is detected in the subsurface samples,blanks are run to validate the tracer detection. <br /> Spill-Bucket Testing <br /> Over-spill-buckets are tested hydro-statically. A decrease in water level indicates a leak. If leaks occur, spill bucket seals <br /> should be repaired or replaced. <br /> Reporting <br /> The findings of the Tracer Tight® ELDTm test and site evaluation will be summarized in a written report and sent to the <br /> client within two weeks of the completion of the fieldwork. All data acquired from probe and sump samples will be <br /> reported along with spill bucket hydro-test results. <br /> For questions or assistance contact: <br /> Contractor <br /> David Rabb <br /> Praxair Services,Inc <br /> 3755 North Business Center Drive <br /> Tucson,Arizona 85705 <br /> Tucson Office 520.545.0250 <br /> Cell 520.906.5474 <br /> Tucson Fax 520.293.1306 <br /> David—Rabb@Praxair.com <br /> THIS INFORMATIONIS THEPROPERTY 0FPR,4XAIR SERVICE,MC <br /> 3er3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.