Laserfiche WebLink
DERGROUND STORAGE TANK <br /> TYPE OF ACTION <br /> RESPONSE PLAN-PAGE 1 <br /> One form facility) <br /> ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION <br /> R01. <br /> FACILITY ID# (Agency <br /> I. FACILITY INFORMATION <br /> Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) I' <br /> Tower Mart#876 3. <br /> BUSINESS SITE ADDRESS <br /> 103. BUSINESS SITE CITY 1°y <br /> 14000 East Hwy 88 <br /> LOC <br /> 95237 <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control Or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system m <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed con in r. Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed m hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to stomr water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in[he facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary, <br /> E UIPMENT NOT PERMANENTLY ON-SIT BUT AVAILABLE FOR USE IF NEEDED: Co tete on! r a licoble <br /> EQUIPMENT <br /> RIO. LOCATION <br /> AVAILABILITY <br /> R20. <br /> MO. <br /> RI1. <br /> R21. <br /> R31. <br /> R12, R22 <br /> R32. <br /> R13. <br /> R23. <br /> R33. <br /> R14, <br /> R24. <br /> 104. <br /> RIS. R26 <br /> R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/AAE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R4°. TITLE <br /> Nick Batta Iia R50 <br /> NAME General Manager R41. TITLE <br /> Paul Chevalier Rs1. <br /> NAME Maintenance Manager Raz. TITLE R32 <br /> Geor a Sisson <br /> NAME Zone Mana er <br /> R43. TITLE <br /> R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ®1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION 02. INSPECTION BY QUALIFIED PERSONS ®3. RECALIBRATION OF EQUIPMENT R60. <br /> ❑99. OTHER(Specify): <br /> R61. <br /> UN-022B-1/3 www.unidocs.org <br /> Rev.04/02/08 <br />