Laserfiche WebLink
70. IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN - (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING tCheckall <br /> that apply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ® 2.FLOAT AND CHAIN ASSEMBLY [1490.54. <br /> 3.ELECTRONIC STAND-ALONE 490-54b. <br /> ❑ 4.NO DISPENSERS [1 99_OTHER(Specify) ago-ss. <br /> LEAK MONITOR MANUFACTURER:Veeder-Root °9LL55' MODEL#:TLS-350 <br /> °91-67. MODEL#(S):Float&Chain/208 Sensors 490-69' <br /> LEAK SENSOR MANUFACTURER: V¢¢d¢[-ROOtI Bravo q90 59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES El b.NO <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. <br /> ® a.YES ❑ b.NO 490-61. <br /> FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49041. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑ b.NO 49042._ <br /> 49143. <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL El 2.DOUBLE WALL 490.64A <br /> IF DOUBLE WALL: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM a9o44b <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. C1 a.YES C1 b.NO <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49145. <br /> MUST BE PERFORMED. PERIODIC EID IS PERFORMED EVERY 36 MONTHS AS REQUIRED. n CCR 42WA 490-46 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49047 <br /> I� 3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> VIII. RECORD KEEPING <br /> 49048. <br /> The following monitoring/maintenance records are kept for this facility: <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> [I d.SIR TESTING RESULTS C] f.ATG TESTING P E UL S(and supporting(and supporting documentation mentation on records) 0 c.TANK GAUGING RESULTS(and ords) ❑ g.CORROSION PROTECTION 60-DAYYing documentation records) <br /> LOGS <br /> ® h.E UIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties: 49o49c <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) 49a69b. <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69c <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490490- <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49M9e <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f. <br /> STATISTICAL INVENTORY RECONCILIATION" 491499. <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49049h. <br /> ❑ OTHER(Specify): 490491. <br /> ® This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council 690-70 <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional colnntrnts here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br /> 491471. <br /> Mechanical flapper set at 95%for overfill prevention <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/ lot is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> b thtsylan occurs;2.)all conditions that indicate a possible release are investigated.and 3•)all monitoring records are maintained p lY _ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> 490-73. <br /> NAME: Mohammad Afzal 490.72. TITLE:Store Manager <br /> 490-74. TITLE:Zone Manager 490-75. <br /> NAME: George Sisson <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certif that the information provided herein is true and accurate to the best of my knowledge. 490-77 <br /> APPLICANT SIGNATURE -_ DATE: <br /> _ 04/21/10 <br /> REPRESENTING:®1.Task Oxman or®-'.Faded mr❑3.AuRh W R ..,vc ofGumr 490-78. 49079. <br /> APPLICANT NAME(print): APPLICANT TITLE: <br /> Paul Chevalier Maintenance Manager <br /> UPCF UST-D(12/2007)-3/4 www.unidecs.org <br />