Laserfiche WebLink
IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - Pae 1 of 2 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) L, <br /> BUSINESS NAME(Same as Facility Name or DBA) Tower Mart# 876 3 <br /> BUSINESS SITE ADDRESS 103. CITY 104' <br /> 14000 East Hwy 88 Lockford, CA 95237 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> b_the equipment manufacturers_inswctions,or annually,whichever is more uent.Such work mus[be performed by qualified personnel.[7.3 cert§2632,26M,,2638,2641] <br /> 490-3a. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490db. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [7.3 CCR§7.632.7.634] 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) I h a k <br /> .11 <br /> ) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.(23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 090-6. <br /> PANEL MANUFACTURER: Veeder-Root 490.7 MODEL#: TLS350 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490.9" MODEL#(S):0794380-208 490-10. <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR 426431 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 49x13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 490-1e. <br /> ❑ d.MONTHLY 11e.OTHER(Specify): 4W17. <br /> a90-1a. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. Cl c.OTHER(Specify): 490-19. <br /> 49020. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] -- <br /> --- <br /> ._.-____ <br /> _ 490.21. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2645] TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS __. .490-22, <br /> 49023. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] <br /> 490-24. <br /> _ TEST FREQUENCY_ ______ ❑ a ANNUALLY - ❑ b.BIENNIALLY .❑ c.OTHER(Specify): 4_9.0-25_ <br /> _ ._____..--_- ...__ ._______ 490.26. <br /> ❑ 99.OTHER(Specify): 490-2T <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) tha ak l)' <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-26. <br /> [23 CCR SECONDARY CONTAINMENT IS: ® a.DRY El b.LIQUID FILLED El c.PRESSURIZED El d.UNDER VACUUM 490-29. <br /> §26361 <br /> PANEL MANUFACTURER:V@@fJ@r-Root 490-30. MODEL#: TLS 350 490-31. <br /> LEAK SENSOR MANUFACTURER: Ve@d@r-Root 490-32. MODEL# 794390-420 490.33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES Cl b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 990-35. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> 490-3]. 490-38. <br /> MELD MANUFACTURER(S):VM1 Diesel /FE Petro Re &Prem _ MODEL#(S): LD99-2000..I STP MLD ___ <br /> INE LEA DETECTOR _. 490-39. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(FLED)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[x3 ccR§z6361 <br /> ELLD MANUFACTURER(S): d90'40MODEL#(S): 49°41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1gP h. 49x-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49044 <br /> ------ -- 0445. <br /> ❑ 4.PIPE INTEGRITY TESTING. <br /> 490-06. <br /> _ TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49047. _ <br /> 49048. <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ® c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 49049 <br /> •Aaowed for vwvaorme of unbuied emrr�rncy gmaazor fuel Pg_g-oalyper H5C�25281.5@x3) _ <br /> - 49050. <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(x)(3)] <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. <br /> 490-52. <br /> ❑ 99.OTHER(Specify) 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.tmldoca.org <br />