My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007- 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_2007- 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:32 AM
Creation date
11/4/2018 5:26:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007- 2008
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\14000\PR0231631\COMPLIANCE INFO 2007- 2008.PDF
QuestysFileName
COMPLIANCE INFO 2007- 2008
QuestysRecordDate
5/18/2017 10:06:39 PM
QuestysRecordID
3388455
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> ISD Flow Meter Installation Guide Installation Steps-Vacuum Assist System Below Sheer Valve <br /> r — — — — — — — — — — — — — <br /> Base of dispenser cabinet I <br /> ® I ® Vapor return line <br /> To of r_ __ _____ _ _ ____ ___ __ ® _— shear valve <br /> pedestal island <br /> gr----- - - - ------ ------ ----laOz ,_ Q° <br /> o vo c° �°oUar-- -- - - - - ---- -------- ----------- ------- ,� po <br /> eQ°d Q orrttc Vapor return line shear I Po p a°p. <br /> 10 Z. �, VQ I valve installed as per <br /> q <br /> a s0, �0,o= pI local code requirements. I�O,oa Cp c <br /> g , <br /> o � - - aoGd�O <br /> p b 0 I 1"NPT Mating fitting(customer supplied) <br /> threaded pipe\ <br /> 5/16 x 3/4" I /1-11.5"NPT X 2"steel nipple <br /> I <br /> hex bolts wi <br /> lock washers(typ.) Cut I Flange with 1"NPT threaded inlet(typ) <br /> INLET — — — Junction box <br /> I / Inlet Fitter (customer <br /> supplied) I <br /> ISD Vapor I�� 6` 0 / <br /> Flow Meter ij U Cade I I <br /> BMJ <br /> B. I <br /> rV / <br /> I Cord grip I <br /> I <br /> — . — <br /> OR — � Outlet O-ring <br /> Seal off <br /> OUTLET — ^ t (customer <br /> End view <br /> dh supplied) <br /> 1-11.5'NPT x 2"steel nipple <br /> Install with i arrow <br /> mI <br /> stapeed n end �Mating tilting(castanet supplied) <br /> pointing down — - — - — - — — <br /> I Conduit to I <br /> Threaded pipe outlet option — TLS Console <br /> (see inlet detail above) <br /> I <br /> I <br /> I �. Required'Y'fitting for <br /> introducing liquid during <br /> TP-201.4 dynamic <br /> Vapor return line backpressure test <br /> Figure 4. Example Vapor Flow Meter Installation Below Shear Valve <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.