My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17815
>
2300 - Underground Storage Tank Program
>
PR0516574
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:42 AM
Creation date
11/4/2018 5:28:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0516574
PE
2381
FACILITY_ID
FA0012684
FACILITY_NAME
SOLARI CLEMENTS RANCH
STREET_NUMBER
17815
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
17815 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\17815\PR0516574\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVAT?ON CERTIFICATE <br /> 17815 N. Hwy 88, Lockeford, CA 95237 <br /> Project Lowrien <br /> Owner Lorraine Solari phae No. (209)931-1444 <br /> Cunrcor <br /> Jim Thorpe Oil , Inc. phoncNo.(209)368-6175 LicenseNo.495699 <br /> INDICATE MET$OD OF SACK:IL.L QUALITY ASSURANCE <br /> _ .. Submission of Soil Engineer-s Compaction Repot.within 30 days of project compleroa, or <br /> X = Subtrassien of verification, e.g., Ioad :?cker, within 3C days of project comp:ceion that one of ttie foilowiny maicni.s •Ht-, <br /> placed x the ezcavadon in 12' lifts: <br /> X A. pea gravel—smooth, roanded materia: trot more than one-ha:f,1;2) inch in diaMeter <br /> B. Crushed rock--self-ccropacting maceral not more than hree-quarters (314) inch in cress mcnoral <br /> Tr easureme^r. (Ute of crushed shed rack x:ll not be pertrurmd for backfill if contact will,be made benveen <br /> the backfill material and:d tanksipipes made of poly resin glass or similar instar izis.) <br /> DECLARATION <br /> I hereby cerriiv dist a Soil Sn nc='s Companor.Report will oe submittei within 30 days of project completion. or submhsion of <br /> verification this the select material desc.bed above will be piaced at a minimum of ve (5) cubic yards per ]000 gallon tzak <br /> di-placement and dial the entire excavazicn will be baektilled ar.�d ccmpwted to insure compliance with the.Uniform Buileine Code <br /> .gppendi;x Chapter 70. <br /> Richard Thorpe <br /> . Cont or <br /> I it, r <br /> - .gnaasre <br /> • Shall be the responsible mazaging employee or.the I.ccwe cr authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.